35 Ill. Adm. Code 370.530
Plant Details
Section 370
Section 370.530 Plant
Details
a) Installation of Mechanical Equipment
The specifications shall be so written that the installation
and initial operation of major items of mechanical equipment will be inspected
and approved by a representative of the manufacturer.
b) Bypasses
Properly located and arranged bypass structures and piping
shall be provided so that each unit of the plant can be removed from service
independently. The bypass design shall facilitate plant operation during unit
maintenance and emergency repair so as to minimize deterioration of effluent
quality and insure rapid process recovery upon return to normal operational
mode.
c) Unit Bypass and Wastewater Pumpage During Construction
Final plans and specifications for upgrading or expanding
existing treatment plants shall include construction scheduling of any unit
bypassing, and appropriate temporary wastewater pumpage acceptable to the
Agency to minimize temporary water quality degradation. Refer to Section
370.260.
d) Drains and Buoyancy Protection
1) Means shall be provided to dewater each unit. Pipes subject
to clogging shall be provided with means for mechanical cleaning or flushing.
2) Due consideration should be given to the possible need for
hydrostatic pressure relief devices to prevent flotation of structures.
e) Construction Materials
Due consideration should be given to the selection of
materials which are to be used in sewage treatment works because of the
possible presence of hydrogen sulfide and other corrosive gases, greases, oils,
and similar constituents frequently present in sewage. This is particularly
important in the selection of metals and paints. Dissimilar metals should be
avoided to minimize galvanic action.
f) Painting
The use of paints containing mercury should be avoided. In
order to facilitate identification of piping, particularly in the large plants,
it is suggested that the different lines be color coded. The following color
scheme is recommended for purposes of standardization:
1) Sludge line – brown
2) Gas line – orange
3) Potable water line – blue
4) Non-potable water line - blue with 3 inch yellow band spaced
30 inches apart
5) Chlorine line – yellow
6) Sewage line – gray
7) Compressed air line – green
8) Water lines for heating digesters or buildings – blue with a
6-inch red band spaced 30 inches apart
9) Sulfur dioxide line – yellow with red bands.
10) The contents shall be stenciled on the piping, labeling the
contents in a contrasting color.
g) Operating Equipment
A complete outfit of tools, accessories (such as portable
pump and ventilation blowers, etc.), and spare parts necessary for the plant
operators use shall be provided. Readily accessible storage space and work
bench facilities shall be provided. Consideration shall be given to provision
of a garage storage area for large equipment storage, maintenance, and repair.
h) Erosion Control During Construction
Effective site erosion control shall be provided during
construction.
i) Grading and Landscaping
Upon completion of the plant, the ground should be graded and
seeded. Concrete or gravel walkways should be provided for access to all
units. Where possible, steep slopes should be avoided to prevent erosion.
Surface water shall not be permitted to drain into any unit. Particular care
shall be taken to protect trickling filter beds, sludge beds, and intermittent
sand filters from storm water runoff. Landscaping shall be provided when a
plant must be located near residential areas.
j) Confined Spaces
The number of confined spaces should be minimized for safety
purposes.