35 Ill. Adm. Code 370.550
Essential Facilities
Section 370
Section 370.550 Essential
Facilities
a) Emergency Power or Pumping Facilities
1) All plants shall be provided with an alternate source of
electric power or pumping capability to allow continuity of operation during
power failures. Methods of providing power or pumping capability include:
A) The connection to at least 2 independent public utility sources
such as substations. A power line from each substation into the treatment
plant with capability for switchover to the second power source by plant
operating personnel will be required.
B) Portable or in place internal combustion engine equipment which
will generate electrical or mechanical energy. Refer to Section 370.136(d).
C) Portable pumping equipment when only emergency pumping is
required. Refer to Section 370.136(d).
2) Standby Generating Capacity Requirements
Standby generating capacity normally is not required for
aeration equipment used in the activated sludge process. In cases where a
history of long term (4 hours or more) power outages have occurred, auxiliary
power for minimum aeration of the activated sludge will be required.
3) Degree of Treatment Required
No reduction in degree of treatment due to power outages will
be allowed when the wastewater is to be treated by installations using
trickling filters, waste stabilization ponds and/or other low energy usage
treatment devices.
4) Continuity of Disinfection
The design shall provide for continuous disinfection during
all power outages, if required due to critical outfall locations and receiving
waters.
5) Continuity of Dechlorination
For facilities using dechlorination equipment, the design
shall provide for continuous dechlorination during all power outages, if
required due to critical outfall locations and receiving waters.
b) Water Supply
1) General
An adequate supply of potable water under pressure should be
provided for use in the laboratory and general cleanliness around the plant.
No piping or other connections shall exist in any part of the treatment works
which, under any conditions, might cause the contamination of a potable water
supply.
2) Direct Connections
A) Potable water from a municipal or separate supply may be used
directly at points above grade for the following hot and cold supplies:
i) Lavatory
sink
ii) Water
closet
iii) Laboratory
sink (with vacuum breaker)
iv) Shower
v) Drinking
fountain
vi) Eye
wash fountain
vii) Safety
shower
viii) Fire
protection sprinklers
B) Hot water for any of the above units shall not be taken
directly from a boiler used for supplying hot water to a sludge heat exchanger
or digester heating unit.
3) Indirect Connections
A) Where a potable water supply is to be used for any purpose in a
plant other than those listed in subsection (b)(2)(A), a break tank, pressure
pump and pressure tank shall be provided. Water shall be discharged to the
break tank through an air-gap at least 6 inches above the maximum flood line or
the spill line of the tank, whichever is higher. A sketch of an acceptable
break tank is contained in Appendix G, Figure No. 4. In-line backflow
preventers are not acceptable.
B) A sign shall be permanently posted at every hose bib, faucet,
or sill cock located on the water system beyond the break tank to indicate that
the water is not safe for drinking.
4) Separate Potable Water Supply
Where it is not possible to provide potable water from a
public water supply, a separate well may be provided. Location and construction
of the well should comply with requirements of the governing State and local
regulations. Requirements governing the use of the supply are those contained
in subsections (b)(2) and (b)(3).
5) Separate Non-Potable Water Supply
Where a separate non-potable water supply is to be provided,
a break tank will not be necessary, but all sill cocks and hose bibs shall be
posted with a permanent sign indicating the water is not safe for drinking.
c) Sanitary Facilities
Toilet, shower, and lavatory should be provided in sufficient
numbers and at convenient locations to serve the expected plant personnel.
d) Floor Slope
Floor surfaces shall be sloped adequately to a point of
drainage.
e) Stairways
Stairways shall be installed in lieu of ladders for access to
those units requiring inspection and maintenance, including but not limited to
trickling filters, digesters, aeration tanks, clarifiers and tertiary filters.
Spiral or winding stairs are permitted only for secondary access where dual
means of egress are provided. Stairways shall have slopes between 30 and 40
degrees from the horizontal to facilitate carrying samples, tools, etc. Each
tread and riser shall be of uniform dimension in each flight. Minimum tread run
shall not be less than 9 inches. The sum of the tread run and riser shall not
be less than 17 nor more than 18 inches. A flight of stairs shall consist of
not more than a 12 foot continuous rise without a platform.
f) Flow Measurement
1) Flow measurement facilities shall be provided so as to measure
the following flows:
A) Plant effluent flow.
B) Plant influent flow, if significantly different from plant
effluent flow, such as for lagoons and plants with excess flow storage or flow
equalization.
C) Excess flow treatment facility discharges.
D) Other flows required to be monitored under the provisions of an
NPDES discharge permit.
E) Flows required for plant operational control, including but not
limited to return activated sludge flow, waste activated sludge flow,
recirculation flow and recycle flows.
2) Indicating, totalizing and recording flow measurement devices
shall be provided for all mechanical plants for all flows except those
specified in subsection (f)(1)(E) above. Flow measurement equipment for lagoon
systems shall consist of, at a minimum, elapsed time meters used in conjunction
with pumping rate test or calibrated weirs. All flow measurement equipment
must be sized to function effectively in the full range of flows expected and
shall be protected against freezing.
3) Flow measurement equipment including entrance and discharge
conduit configuration and critical control elevations shall be designed to
ensure that the required hydraulic conditions necessary for accurate
measurement are provided. Conditions that must be avoided include turbulence,
eddy currents, air entrainment, etc., that upset the normal hydraulic
conditions that are necessary.
g) Sampling Equipment
Effluent composite sampling equipment shall be provided at
all mechanical plants and at other facilities where necessary to meet discharge
permit monitoring requirements.