35 Ill. Adm. Code 370.830
Anaerobic Sludge Digestion
Section 370
Section 370.830 Anaerobic
Sludge Digestion
a) General
1) Multiple Units
Multiple units or alternate methods of sludge processing
shall be provided. Facilities for sludge storage and supernatant separation in
an additional unit may be required, depending on raw sludge concentration and
disposal methods for sludge and supernatant.
2) Depth
If process design provides for supernatant withdrawal, the
proportion of depth to diameter should be such as to allow for the formation of
a reasonable depth of supernatant liquor. A minimum side water depth of 20
feet is recommended.
3) Design Maintenance Provisions
To facilitate emptying, cleaning, and maintenance the
following features are desirable:
A) Slope
The tank bottom shall slope to drain toward the withdrawal
pipe. For tanks equipped with a suction mechanism for sludge withdrawal, a
bottom slope not less than 1 to 12 is recommended. Where the sludge is to be
removed by gravity alone, 1 to 4 slope is recommended.
B) Access Manholes
At least 2 access manholes should be provided in the top of
the tank in addition to the gas dome. There should be stairways to reach the
access manholes. A separate side wall manhole shall be provided that is large
enough to permit the use of mechanical equipment to remove grit and sand. The
side wall access manhole should be low enough to facilitate heavy equipment
handling and may be buried in the earthen bank insulation.
C) Safety
Non-sparking tools, rubber-soled shoes, safety harness, gas
detectors for inflammable and toxic gases, and at least two self-contained
breathing units shall be provided for emergency use.
4) Toxic Materials
If the anaerobic digestion process is proposed, the basis of
design shall be supported by wastewater analyses to determine the presence of
undesirable materials, such as high concentrations of sulfates and inhibitory
concentrations of heavy metals.
b) Sludge Inlets and Outlets, Recirculation and High Level
Overflows
1) Multiple sludge inlets and draw-offs and, where used, multiple
recirculation suction and discharge points to facilitate flexible operation and
effective mixing of the digester contents shall be provided unless adequate
mixing facilities are provided within the digester.
2) One inlet should discharge above the liquid level and be
located at approximately the center of the tank to assist in scum breakup. The
second inlet should be opposite to the suction line at approximately the 2/3
diameter point across the digester.
3) Raw sludge inlet discharge points should be so located as to
minimize short circuiting to the digested sludge or supernatant draw-offs.
4) Sludge withdrawal to disposal should be from the bottom of the
tank. The bottom withdrawal pipe should be interconnected with the necessary
valving to the recirculation pipe, to increase versatility in mixing the tank
contents.
5) An unvalved vented overflow shall be provided to prevent
damage to the digestion tank and cover in case of accidental overfilling. This
emergency overflow shall be piped to a point and at a rate in the treatment
process or sidestream treatment facilities so as to minimize the impact on
process units.
c) Tank Capacity
1) Rational Design
The total digestion tank capacity shall be determined by
rational calculations based upon such factors as volume of sludge added, its
percent solids, and character, the temperature to be maintained in the
digesters, the degree or extent of mixing to be obtained, the degree of
volatile solids reduction required, method of sludge disposal, and the size of
the installation with appropriate allowances for gas, scum, supernatant and
digested sludge storage. Secondary digesters of two-stage series digestion
systems that are used for digested sludge storage and concentration shall not
be credited in the calculations for volumes required for sludge digestion.
Calculations should be submitted to justify the basis of design.
2) Empirical Design
When such calculations are not submitted to justify the
design based on the above factors, the minimum combined digestion tank capacity
outlined below will be required. Such requirements assume that the raw sludge
is derived from ordinary domestic wastewater, a digestion temperature is to be
maintained in the range of 85~ to 95~ F (29~ to 35~ C), 40 to 50 percent
volatile matter in the digested sludge, and that the digested sludge will be
removed frequently from the process. (See also subsection (a)(1) above and
Section 370.860(a)(1).)
A) Completely Mixed Systems
For digestion systems providing for intimate and effective
mixing of the digester contents, the system may be loaded up to 80 pounds of
volatile solids per 1000 cubic feet of volume per day in the active digestion
units.
B) Moderately Mixed Systems
For digestion systems where mixing is accomplished only by
circulating sludge through an external heat exchanger, the system may be loaded
up to 40 pounds of volatile solids per 1000 cubic feet of volume per day in the
active digestion units. This loading may be modified upward or downward
depending upon the degree of mixing provided.
C) Digester Mixing
Facilities for mixing the digester contents shall be provided
where required for proper digestion by reason of loading rates or other
features of the system. Where sludge recirculation pumps are used for mixing,
they shall be provided in accordance with the applicable requirements of
Section 370.850(a).
d) Gas Collection, Piping, and Appurtenances
1) General
All portions of the gas system including the space above the
tank liquor, storage facilities and piping shall be so designed that under all
normal operating conditions, including sludge withdrawal, the gas will be
maintained under pressure. All enclosed areas where any gas leakage might
occur shall be adequately ventilated.
2) Safety Equipment
All necessary safety facilities shall be included where gas
is produced. Pressure and vacuum relief valves and flame traps together with
automatic safety shut off valves shall be provided and protected from
freezing. Water seal equipment shall not be installed. Safety equipment and
gas compressors should be housed in a separate room with an exterior door.
3) Gas Piping and Condensate
Gas piping shall have a minimum diameter of 4 inches, except
that a smaller diameter pipe may be used at the gas production meter. Gas
piping shall slope to condensation traps at low points. The use of
float-controlled condensate traps is not permitted. Condensation traps shall
be protected from freezing. Tightly fitted self-closing doors should be
provided at connecting passageways and tunnels which connect digestion
facilities to other facilities to minimize the spread of gas. Piping galleries
shall be ventilated in accordance with subsection (d)(7).
4) Gas Utilization Equipment
Gas burning boilers, engines, etc., shall be located in well
ventilated rooms. Such rooms would not ordinarily be classified as a hazardous
location if isolated from the digestion gallery or ventilated in accordance
with subsection (d)(7). Gas lines to these units shall be provided with
suitable flame traps.
5) Electrical Fixtures
Electrical fixtures and controls, in places enclosing
anaerobic digestion appurtenances, where hazardous gases are normally contained
in the tanks and piping, shall comply with the National Electric Code for Class
1, Group D, Division 2 locations. Refer to subsection (d)(7).
6) Waste Gas
A) Waste gas burners shall be readily accessible and should be
located at least 50 feet away from any plant structure if placed at ground
level, or may be located on the roof of the control building if sufficiently
removed from the tank. Waste gas burners shall be of sufficient height to
prevent injury to personnel due to wind or downdraft conditions.
B) All waste gas burners shall be equipped with automatic ignition
such as a pilot light or a device using a photoelectric cell sensor.
Consideration should be given to the use of natural or propane gas to insure
reliability of the pilot.
C) Gas piping shall be sloped at a minimum of 2 percent up to the
waste gas burner with a condensate trap provided in a location not subject to
freezing.
7) Ventilation
Any underground enclosures connecting with digestion tanks or
containing sludge or gas piping or equipment shall be provided with forced
ventilation in accordance with Section 370.410(g)(1-4) and (6).
8) Meter
A gas meter with bypass shall be provided to meter total gas
production for each active digestion unit. Total gas production for two-stage
digestion systems operated in series may be measured by a single gas meter with
proper interconnected gas piping. Where multiple primary digestion units are
used with a single secondary digestion unit, a gas meter shall be provided for
each primary digestion unit. The secondary digestion unit may be
interconnected with the gas measurement unit of one of the primary units.
Interconnected gas piping shall be properly valved with gastight gate valves to
allow measurement of gas production from, or maintenance of, either digestion
unit. Gas meters may be of the orifice plate, turbine or vortex type. Positive
displacement meters are not recommended. The meter used must be specifically
designed for contact with corrosive and dirty gases.
e) Digestion Tank Heating
1) Insulation
Wherever possible digestion tanks should be constructed above
ground-water level and shall be suitably insulated to minimize heat loss.
Maximum utilization of earthen bank insulation should be used.
2) Heating Facilities
Sludge may be heated by circulating the sludge through
external heaters or by units located inside the digestion tank. Refer to
subsection (e)(2)(B).
A) External Heating
Piping shall be designed to provide for the preheating of
feed sludge before introduction into the digesters. Provisions shall be made
in the lay-out of the piping and valving to facilitate heater exchanger tube
removal and cleaning of the lines. Heat exchanger sludge piping should be
sized for peak heat transfer requirements. Heat exchangers should have a
heating capacity of 130 percent of the calculated peak heating requirement to
account for sludge tube fouling.
B) Other Heating Methods
i) The use of hot water heating coils affixed to the walls of
the digester, or other types of internal heating equipment that require
emptying the digester contents for repair, are not acceptable.
ii) Other systems and devices have been developed recently to
provide both mixing and heating of anaerobic digester contents. These systems
will be reviewed on their own merits. Operating data detailing their
reliability, operation and maintenance characteristics will be required.
3) Heating Capacity
A) Sufficient heating capacity shall be provided to consistently
maintain the design sludge temperature considering the insulation provided and
ambient cold weather conditions. Where digestion tank gas is used for other
purposes, an auxiliary fuel may be required.
B) The provision of standby heating capacity or the use of
multiple units sized to provide the heating requirements shall be considered
unless acceptable alternative means of handling raw sludge are provided.
4) Hot Water Internal Heating Controls
A) Mixing Valves
A suitable automatic mixing valve shall be provided to temper
the boiler water with return water so that the inlet water to the removable
heat jacket or coil in the digester can be held below a temperature at which
caking will be accentuated. Manual control should also be provided by suitable
bypass valves.
B) Boiler Controls
The boiler should be provided with suitable automatic
controls to maintain the boiler temperature at approximately 180~ F (82~ C) to
minimize corrosion and to shut off the main gas supply in the event of pilot
burner or electrical failure, low boiler water level, low gas pressure,
excessive boiler water temperature or pressure.
C) Boiler Water Pumps
Boiler water pumps shall be sealed and sized to meet the
operating conditions of temperature, operating head and flow rate. Duplicate
units shall be provided.
D) Thermometers
Thermometers shall be provided to show inlet and outlet
temperatures of the sludge, hot water feed, hot water return and boiler water.
E) Water Supply
The chemical quality of the water supply shall be suitable
for use as boiler water. Refer to Section 370.550(b) for additional water
supply considerations.
5) External Heater Operating Controls
All controls necessary to insure effective and safe operation
are required. Provision for duplicate units in critical elements should be
considered.
f) Supernatant Withdrawal
Where supernatant separation is to be used to concentrate
sludge in the digester units and increase digester solids retention time, the
design shall provide for ease of operation and positive control of supernatant
quality.
1) Piping Size
Supernatant piping should not be less than 6 inches in
diameter.
2) Withdrawal Arrangements
A) Withdrawal Levels
Piping should be arranged so that withdrawal can be made from
3 or more levels in the tank. An unvalved vented overflow shall be provided.
The emergency overflow shall be piped to a point and at a rate in the treatment
process or sidestream treatment facilities so as to minimize the impact on
process units.
B) Withdrawal Selection
On fixed cover tanks the supernatant withdrawal level should
preferably be selected by means of interchangeable extensions at the discharge
end of the piping.
C) Supernatant Selector
A fixed screen supernatant selector or similar device may
only be used in an unmixed secondary digestion unit. If such a supernatant
selector is provided, provisions shall be made for at least one other draw-off
level located in the supernatant zone of the tank, in addition to the unvalved
emergency supernatant draw-off pipe. High pressure back-wash facilities shall
be provided.
3) Sampling
Provision shall be made for sampling at each supernatant
draw-off level. Sampling pipes should be at least 1 1/2 inches in diameter and
should terminate at a suitably sized sampling sink or basin.
4) Supernatant Disposal
Supernatant return and disposal facilities shall be designed
to prevent adverse hydraulic and organic effects on plant operations. If
nutrient removal (e.g., phosphorus, ammonia) must be accomplished at a plant,
then a separate supernatant side stream treatment system should be considered.