a) General
On-site sludge dewatering facilities shall be provided for
all plants, although the following requirements may be reduced or omitted, if
justified, with on-site liquid sludge storage facilities or approved off-site
sludge disposal.
1) Anaerobic Digestion Sludge Production
For purposes of calculating sludge handling and disposal
needs, sludge production values from a two-stage anaerobic digestion process
shall be based on a maximum solids concentration of 5% without additional
thickening. The solids production values, calculated on a dry weight basis,
shall be based on the following values for the listed processes:
A) Primary plus waste activated sludge – at least 0.12
lbs/P.E./day;
B) Primary plus fixed film reactor sludge – at least 0.09
lbs/P.E./day.
2) Aerobic Digestion Sludge Production
For purposes of calculating sludge handling and disposal
needs, sludge production values from an aerobic digester shall be based on a
maximum solids concentration of 2% without additional thickening. The solids
production values, calculated on a dry weight basis, shall be based on the
following values for the listed processes:
A) Primary plus waste activated sludge – at least 0.16
lbs/P.E./day;
B) Primary plus fixed film reactor sludge--at least 0.12 lbs/P.E./day.
3) Production from Other Sludge Treatment Processes
For purposes of calculating sludge handling and disposal
needs, sludge production values from other sludge treatment processes shall be
determined by rational calculations in the basis of design. Refer to Section
370.520(b) for any new process determinations.
b) Sludge Drying Beds
1) Applicability
Sludge drying beds may be used for dewatering well digested
sludge from either the anaerobic or aerobic process. Due to the large volume
of sludge produced by the aerobic digestion process, consideration should be
given to using a combination of dewatering systems or other means of ultimate
sludge disposal.
2) Unit Sizing
Sludge drying bed area shall be calculated on a rational
basis with the following items taken into account:
A) The volume of wet sludge produced by existing and proposed
processes.
B) Depth of wet sludge drawn to the drying beds. For design
calculations purposes a maximum depth of 8 inches shall be utilized. For
operational purposes, the depth of sludge placed on the drying bed may vary
from the design depth based on the solids content and the type of digestion
used.
C) Total digester volume and other wet sludge storage facilities.
D) Degree of sludge thickening provided after digestion.
E) The maximum drawing depth of sludge which can be removed from
the digester or other sludge storage facilities without causing process or
structural problems.
F) The time required on the bed to produce a removable cake.
Adequate provision shall be made for sludge dewatering and/or sludge disposal
facilities for those periods of time during which outside drying of sludge on
beds is hindered by weather. For Illinois that season is considered to extend
from early November through at least April.
G) Capacities of auxiliary dewatering facilities.
3) Percolation Type Bed Components
A) Gravel
The lower course of gravel around the underdrains should be
properly graded and should be 12 inches in depth, extending at least 6 inches
above the top of the underdrains. It is desirable to place this in 2 or more
layers. The top layer of at least 3 inches should consist of gravel ⅛
inch to ¼ inch in size.
B) Sand
The top course should consist of at least 6 to 9 inches of
clean, washed, coarse sand. The effective size of the sand should be in the
range of 0.8 to 1.5 millimeters. The finished sand surface should be level.
C) Underdrains
Underdrains should be at least 4 inches in diameter laid with
open joints. Perforated pipe may also be used. Underdrains should be spaced not
more than 20 feet apart. Various pipe materials may be used, so long as they
are sufficiently strong and are corrosion resistant.
D) Additional Dewatering Provisions
Consideration shall be given to providing a means of
decanting the supernatant of sludge placed on the sludge drying beds. More
effective decanting of supernatant may be accomplished with polymer treatment
of the sludge.
4) Walls
Walls should be water-tight and extend 18 inches above and at
least 6 inches below the surface of the bed. Outer walls should be curbed or
extended at least 4 inches above the outside grade elevation to prevent soil
from washing on to the beds.
5) Sludge Removal
Each bed shall be constructed so as to be readily and
completely accessible to mechanical cleaning equipment. Concrete runways spaced
to accommodate mechanical equipment shall be provided. Special attention
should be given to assure adequate access to the areas adjacent to the
sidewalls. Entrance ramps down to the level of the sand bed shall be
provided. These ramps shall be high enough to eliminate the need for an
entrance end wall for the sludge bed.
c) Sludge Lagoons for Dewatering
1) General
Lagoons as a means of dewatering digested sludge will be
permitted only upon proof that the character of the digested sludge and the
design mode of operation are such that offensive odors will not result. Where
sludge lagoons are permitted, adequate provisions shall be made for other
sludge dewatering facilities or sludge disposal in the event of upset or
failure of the sludge digestion process.
2) Location
Sludge lagoons shall be located as far as practicable from
inhabited areas or areas likely to be inhabited during the lifetime of the
structures.
3) Seal
Adequate provisions shall be made to seal the lagoon bottoms
and embankments to prevent leaching into adjacent soils or groundwater. Refer
to Section 370.930(d)(1)(A), (d)(2)(C) and (d)(2)(D).
4) Access
Provisions shall be made for sludge pumping or heavy
equipment access for sludge removal from the lagoon.
d) Mechanical Dewatering Facilities
1) General
Provision shall be made to maintain sufficient continuity of
service so that sludge may be dewatered without accumulation beyond storage
capacity. The number of vacuum filters, centrifuges, filter presses, belt
filters, or other mechanical dewatering facilities should be sufficient to
dewater the sludge produced with the largest unit out of service. Unless other
standby wet sludge facilities are available, adequate storage facilities of at
least 4 days production volume shall be provided. Documentation must be
submitted justifying the basis of design of mechanical dewatering facilities.
2) Water Supply Protection
The water supply for mechanical dewatering facilities shall
meet the requirements of Section 370.550(b).
3) Auxiliary Facilities for Vacuum Filters
Back-up vacuum and filtrate pumps shall be provided. It is
permissible to have uninstalled back-up vacuum and filtrate pumps for every
three or less vacuum filters, provided that the installed units can easily be
removed and replaced. At least one filter media replacement unit shall be
provided.
4) Ventilation
Adequate facilities shall be provided for ventilation of the
dewatering area. The exhaust air should be properly conditioned to avoid odor
nuisance. Ventilation shall be provided in accordance with Section
370.410(g)(6).
5) Chemical Handling Enclosures
Lime-mixing facilities should be completely enclosed to
prevent the escape of lime dust. Chemical handling equipment should be
automated to eliminate the manual lifting requirement. Refer to Section
370.560.
e) Drainage and Filtrate Disposal
Drainage from beds or filtrate dewatering units shall be
returned to the sewage treatment process at appropriate points and rates.
f) Other Dewatering Facilities
If it is proposed to dewater sludge by other methods, a
detailed description of the process and design data shall accompany the plans.
Refer to Section 370.520(b) for any new process determinations.