35 Ill. Adm. Code 370.850
Sludge Pumps and Piping
Section 370
Section 370.850 Sludge Pumps
and Piping
a) Sludge Pumps
1) Capacity
Pump capacities shall be adequate but not excessive.
Provision for varying pump capacity is desirable. A rational basis of design
shall be provided with the plan documents.
2) Duplicate Units
Duplicate units shall be provided at all installations.
3) Type
Plunger pumps, screw feed pumps or other types of pumps with
demonstrated solids handling capability shall be provided for handling raw
sludge. Where centrifugal pumps are used, a parallel positive displacement
pump shall be provided as an alternate to pump heavy sludge concentrations,
such as primary or thickened sludges, that may exceed the pumping head of the
centrifugal pump.
4) Minimum Head
A minimum positive head of 24 inches shall be provided at the
suction side of centrifugal type pumps and is desirable for all types of sludge
pumps. Maximum suction lifts should not exceed 10 feet for plunger pumps.
5) Sampling Facilities
Unless sludge sampling facilities are otherwise provided,
quick closing sampling valves shall be installed at the sludge pumps. The size
of valve and piping should be at least 1½ inches and terminate at a suitably
sized sampling sink or floor drain.
b) Sludge Piping
1) Size and Head
Digested sludge withdrawal piping should have a minimum
diameter of 8 inches for gravity withdrawal and 6 inches for pump suction and
discharge lines. Where withdrawal is by gravity, the available head on the
discharge pipe should be at least 4 feet and preferably more. Undigested
sludge withdrawl piping shall be sized in accordance with Section
370.720(b)(3).
2) Slope and Flushing Requirements
Gravity piping should be laid on uniform grade and
alignment. Slope on gravity discharge piping should not be less than 3 percent
for primary sludges and all sludges thickened to greater than 2 percent
solids. The slope on gravity discharge piping should not be less than 2
percent for aerobicly digested sludge or waste activated sludge with less than
2 percent solids. Cleanouts shall be provided for all gravity sludge piping.
Provisions shall be made for draining and flushing discharge lines. All sludge
pipe shall be suitably located or otherwise adequately protected to prevent
freezing.
3) Supports
Special consideration shall be given to the corrosion
resistance and permanence of supporting systems for piping located inside the
digestion tank.