35 Ill. Adm. Code 391.APPENDIX G
G Sludge User Information Sheet
Section 391.APPENDIX G Sludge
User Information Sheet
1.
Date:
2.
Name of User:
3.
Address of User:
4.
Phone Number of User:
5.
Location Where Sludge is to be
Used:
6.
Size of Area Where Sludge is
to be Used:
7
.
Proximity of Site to closest:
(a) Stream or other body of
water
(b) Dwelling
(c) Well
(d) Other Water Supply,
(describe)
8.
Amount of Sludge Obtained:
(Specify
units)
9.
Describe Use(s) of Sludge
(e.g., Farmland or Agricultural, Garden, Yard, Reclamation of Nutrient
Deficient Land, Other):
10.
Manner in Which Sludge is to
be Applied (e.g., Spread by Truck or dry applicator, by Hand, Worked into the
Soil by Plowing, Rototilling, Surface Application, Splash Plate, Knife
injection, other):
11.
Will Sludge be Stockpiled
Before Application:
Yes
No
(Circle One)
12.
Estimated Length of Time
Sludge is to be Stockpiled:
13.
Type and expected yield of
crops to be grown on sludge conditioned land:
14.
I desire to have the sludge
applied at a rate that will satisfy my crop's NITROGEN; PHOSPHORUS (Circle
One) needs.
15.
The soil pH of the land that I
am applying sludge is:
16.
The average depth to the
groundwater table on the site where I am using the sludge is
ft.
How determined?
17.
Limitations from Site
Characteristics:
18.
Has sludge been applied to
land within last 5 years?
Yes
No
(Circle One)
Name of Generator
Amount Applied
Years Applied
SPECIFIC
REQUIREMENTS FOR THE USE OF SLUDGE
The sludge that you are obtaining
contains the following:
Plant Available Nitrogen (N)
% and/or
lbs. per dry ton
Phosphorus (P
2
O
5
)
% and/or
lbs. per dry ton
Soluble Potash (K
2
O)
% and/or
lbs per dry ton
Cadmium (Cd)
lbs. per dry ton
Copper (Cu)
lbs. per dry ton
Lead (Pb)
lbs. per dry ton
Manganese (Mn)
lbs. per dry ton
Nickel (Ni)
lbs. per dry ton
Zinc (Zn)
lbs. per dry ton
To maximize the benefits of
conditioning soils with sludge and minimizing possible adverse effects on the
environment, it is required that the following provisions be adhered to:
1. Cropping
and Access Restrictions:
a. It is not recommended that leafy or root vegetables such as
lettuce, Swiss chard, potatoes, horseradish, carrots, etc., be grown on sludge
conditioned soil.
b. Pasture or hay ground that has received sludge shall not be
harvested or used for livestock grazing for one month or until precipitation of
sufficient duration and intensity has occurred and washed all sludge from that
area of the plant which can be injested by an animal, whichever is greater.
2. Climate
Conditions:
a. Sludge application shall not be permitted on land during
precipitation.
b. Sludge application shall not be permitted on land which is
saturated or with ponded water.
c. Sludge application should not be permitted upon sites when
precipitation is imminent or which have received greater than ¼ inch rainfall
within the 24 hour period preceding the application time.
d. Sludge application shall not be permitted on ice or snow
covered ground. Frozen ground which is not ice or snow covered and has a slope
of 5% or less may be used for winter spreading providing a 200 feet grassy area
of forage crop exists between the sludge applied land and any surface water or
water well.
3. Buffer
Area Requirements
a. Sludge shall not be applied on land which lies within 150 feet
from wells or other water supplies and 200 feet from surface waters or within
one-fourth of a mile of any potable water supply well located in consolidated
bedrock or sinkhole areas unless 50 feet of non-sandy or non-gravelly
unconsolidated material exists.
b. Sludge application by incorporation or injection shall not be
done closer than 20 feet from any occupied dwelling or 10 feet from the closest
edge of traveled portions of a public road or outside roadway fence lines.
c. Top application of sludge with no immediate incorporation
shall not be done closer than 200 feet from any occupied dwelling or 20 feet
from the closest edge of traveled portions of a primary and secondary public
roads or 10 feet from the closest edge of lesser utilized public roads or
outside roadway fence lines.
d. Sludge application by ridge and furrow shall not be done
closer than 200 feet from any occupied dwelling or the closest edge of traveled
portions of a public road or outside roadway fence lines.
e. Sludge shall not be applied in waterways. Application to
flood plains having a frequency of return more often than a ten-year frequency
shall not be allowed.
4. Soil
and Geologic Conditions:
a. Sludge applied land must have a soil pH of 6.5 or greater and
cation exchange capacity of 5 or greater. Water treatment plant lime sludge may
be used to raise the soil pH.
b. For sludge applied soils having the following infiltration
rates/hour as determined by standard percolation tests, the listed minimum soil
depth to the mean annual water table shall be adhered to:
Greater than 2 inches/hour – 10 feet
Less than or equal to 2 inches/hour – 5 feet
c. Sludge shall not be top applied (no incorporation) to farm
land having greater than 5% slope. If the slope does exceed 5% top application
can be used providing the annual soil loss, as calculated by the Universal Soil
Loss Equation shall not exceed 5 tons/acre.
d. Sludge may be incorporated on lands having slopes up to eight
percent, irrespective of soil loss. If the slope exceeds eight percent,
incorporation methods may be used providing the annual soil loss does not
exceed five tons per acre when applying the Universal Soil Loss Equation.
5. Interim
Storage and Application Restrictions:
a. Off-site interim storage of liquid sludge prior to land
application is not allowed.
b. Off-site interim storage of dried sludge in excess of 2 months
is not allowed.
c. Annual sludge application shall not exceed the nitrogen
agronomic rates for the crop grown nor exceed the rate for the most restrictive
heavy metal for the site lifetime, whichever is more restrictive. Therefore,
the maximum annual amount of sludge you can apply for your specific needs may
not exceed _____dry tons/acre; gallons/acre (Circle One).
________________________________________
I hereby agree to adhere to the
above conditions.
All blanks other than the above
sign-off shall be filled in by the sludge generator.