35 Ill. Adm. Code 391.APPENDIX H
H Public Distribution Information Sheet
Section 391
Section 391.APPENDIX H Public
Distribution Information Sheet
1.
Date:
2.
Name of User:
3.
Address of User:
4.
Phone Number of User:
5.
Location Where Sludge is to be
Used:
6.
Size of Area Where Sludge is
to be Used:
7.
Proximity of Site to closest:
(a) Stream or other body of
water
(b) Dwelling
(c) Well
8.
Amount of Sludge Obtained:
(Specify
units)
9.
Describe Use(s) of Sludge
(e.g., Garden, Yard, Horticultural, Reclamation of Nutrient Deficient Land,
Other):
10.
Manner in Which Sludge is to
be Applied and Incorporated (e.g., Spread by Truck or dry applicator, by
Hand, Worked into the Soil by Plowing, Rototilling, other):
Specific
Requirements for Public Distribution Programs
The sludge that you are
obtaining contains the following:
Plant Available Nitrogen (N)
% and/or
lbs. per dry ton
Phosphorus (P
2
O
5
)
% and/or
lbs. per dry ton
Cadmium (Cd)
lbs. per dry ton and/or
mg/kg (not to exceed 25 mg/kg)
Copper (Cu)
lbs. per dry ton
Lead (Pb)
lbs. per dry ton
Manganese (Mn)
lbs. per dry ton
Nickel (Ni)
lbs. per dry ton
Zinc (Zn)
lbs. per dry ton
1. Sludge shall not be applied to sites used for growing of
commercial truck gardening vegetables grown and sold for direct human
consumption. It is also not recommended that sludge be applied to sites for
individual use that may grow leafy (lettuce, spinach, Swiss chard. etc.) or
root vegetables (potatoes, carrots, radishes, etc.) unless the following
conditions are met:
a. the sludge does not contain more than 10 mg Cd/kg (dry weight
basis);
b. the sludge has been aged for approximately 3 years after digestion
or stabilization;
c. all vegetables are thoroughly washed or cooked prior to
consumption.
2. Sludge shall be uniformly spread on the land as soon as
possible after transport to the application site.
3. Sludge shall not be applied on land:
(1) during precipitation;
(2) which is saturated or with ponded water.
4. Sludge should not be applied on land:
(1) when precipitation is imminent;
(2) which has received greater than ¼ inch rainfall within the 24
hour period preceding the intended application time.
5. Sludge shall be incorporated as soon as possible after
application to prevent odor emission and runoff potential. Sludge shall be
incorporated within 48 hours or prior to any rainfall after application
whichever is most restrictive.
6. The application rate shall not exceed 10 dry tons/acre or _____inches
in depth.
7. Sludge shall not be applied on land which lies within 150 feet
from wells or other water supplies and 200 feet from surface waters or
intermittent streams.
8. Wind direction and velocity, humidity and the day of the week
shall also be considered prior to sludge transport and applications with
respect to neighboring activities.
9. Sludge amended land shall not lie fallow, but shall be seeded
and stabilized for plant growth as soon as possible after sludge application
and incorporation.
_______________________________________
I hereby agree to adhere to the
above conditions.