35 Ill. Adm. Code 391.APPENDIX I
I Water Treatment Plant Sludge User Information Sheet
Section 391
Section 391.APPENDIX I Water
Treatment Plant Sludge User Information Sheet
1.
Date:
2.
Name of User:
3.
Address of User:
4.
Phone Number of User:
5.
Location Where Sludge is to be
Used:
6.
Size of Area Where Sludge is
to be Used:
7.
Proximity of Site to closest:
(a) Stream or other body of
water
(b) Dwelling
(c) Well
(d) Other Water Supply,
(describe)
8.
Amount of Sludge Obtained:
(Specify
units)
9.
Describe Use(s) of Sludge
(e.g., Farmland or Agricultural, Garden, Yard, Reclamation of Nutrient
Deficient Land, Other):
10.
Manner in Which Sludge is to
be Applied (e.g., Spread by Truck or dry applicator, by Hand, Worked into the
Soil by Plowing, Rototilling, Surface Application, Splash Plate, Knife
injection, other):
11.
Will Sludge be Stockpiled
Before Application:
Yes
No
(Circle One)
12.
Estimated Length of Time
Sludge is to be Stockpiled:
13.
Type and expected yield of
crops to be grown on sludge conditioned land:
14.
The soil pH of the land that I
am applying sludge is:
15.
Limitations from Site
Characteristics:
16.
Has sludge been applied to
land within last 5 years?
Yes
No
(Circle One)
Name of Generator
Amount Applied
Years Applied
SPECIFIC REQUIREMENTS FOR THE USE OF
WATER TREATMENT PLANT SLUDGE
The sludge that you are
obtaining contains the following:
Calcium Carbonate Equivalent
%
pH
Barium (Ba)
lbs. per dry ton
Cadmium (Cd)
lbs. per dry ton
Copper (Cu)
lbs. per dry ton
Lead (Pb)
lbs. per dry ton
Nickel (Ni)
lbs. per dry ton
Selenium (Se)
lbs. per dry ton
Zinc (Zn)
lbs. per dry ton
To maximize the benefits of
conditioning soils with sludge and minimizing possible adverse effects on the
environment, it is required that the following provisions be adhered to:
1. Climate Conditions:
a. Sludge application shall not be permitted on land during
precipitation.
b. Sludge application shall not be permitted on land which is
saturated or with ponded water.
c. Sludge application should not be permitted upon sites when
precipitation is imminent or which have received greater than ¼ inch rainfall
within the 24 hour period preceding the application time.
d. Sludge application shall not be permitted on ice or snow covered
ground. Frozen ground which is not ice or snow covered and has a slope of 5%
or less may be used for winter spreading providing a 200 feet grassy area or
forage crop exists between the sludge applied land and any surface water or
water well.
2. Buffer Area Requirements
a. Sludge application by incorporation or injection shall not be
done closer than 20 feet from any occupied dwelling or 10 feet from the closest
edge of traveled portions of a public road or outside roadway fence lines.
b. Surface application of sludge with no immediate incorporation
shall not be done closer than 200 feet from any occupied dwelling or 20 feet
from the closest edge of traveled portions of a primary and secondary public
roads or 10 feet from the closest edge of lesser utilized public roads or
outside roadway fence lines.
c. Sludge shall not be applied in waterways. Application to
flood plains having a frequency of return more often than a ten-year frequency
shall not be allowed.
3. Soil and Geologic Conditions:
a. Sludge shall not be top applied (no incorporation) to farm
land having greater than 5% slope. If the slope does exceed 5% top application
can be used providing the annual soil loss, as calculated by the Universal Soil
Loss Equation shall not exceed 5 tons/acre.
b. Sludge may be incorporated on lands having slopes up to eight
percent, irrespective of soil loss. If the slope exceeds eight percent,
incorporation methods may be used providing the annual soil loss does not
exceed five tons per acre when applying the Universal Soil Loss Equation.
4. Interim Storage and Application Restrictions:
a. Off-site interim storage of liquid sludge to land application
is not allowed.
b. Off-site interim storage of dried sludge in excess of 2 months
is not allowed.
________________________________________
I hereby agree to adhere to the
above conditions.
All blanks other than the above
sign-off shall be filled in by the sludge generator.