35 Ill. Adm. Code 6110.611.1016
Requirements for Microbial Toolbox Components: Source Toolbox Components
TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE F: PUBLIC WATER SUPPLIES
CHAPTER I: POLLUTION CONTROL BOARD
PART 611 PRIMARY DRINKING WATER STANDARDS
SECTION 611.1016 REQUIREMENTS FOR MICROBIAL TOOLBOX COMPONENTS: SOURCE TOOLBOX COMPONENTS
Section 611.1016 Requirements for Microbial Toolbox
Components: Source Toolbox Components
a) Watershed
Control Program. A supplier receives 0.5-log Cryptosporidium treatment credit
for implementing a watershed control program that meets the requirements of
this Section.
1) A
supplier that intends to apply for the watershed control program credit must
notify the Agency of its intent no later than two years prior to the treatment
compliance date applicable to the supplier in Section 611.1013.
2) A
supplier must submit to the Agency a proposed watershed control plan no later
than one year before the applicable treatment compliance date in Section
611.1013. The Agency must approve the watershed control plan for the supplier
to receive watershed control program treatment credit. The watershed control
plan must include the following elements:
A) Identification
of an "area of influence" outside of which the likelihood of
Cryptosporidium or fecal contamination affecting the treatment plant intake is
not significant. This is the area to be evaluated in future watershed surveys under
subsection (a)(5)(B);
B) Identification
of both potential and actual sources of Cryptosporidium contamination and an
assessment of the relative impact of these sources on the supplier's source
water quality;
C) An
analysis of the effectiveness and feasibility of control measures that could
reduce Cryptosporidium loading from sources of contamination to the supplier's
source water; and
D) A
statement of goals and specific actions the supplier will undertake to reduce
source water Cryptosporidium levels. The plan must explain how the actions are
expected to contribute to specific goals, identify watershed partners and their
roles, identify resource requirements and commitments, and include a schedule
for plan implementation with deadlines for completing specific actions
identified in the plan.
3) A
supplier with an existing watershed control program (i.e., a program in place
on January 5, 2006) is eligible to seek this credit. Its watershed control
plans must meet the criteria in subsection (a)(2) and must specify ongoing and
future actions that will reduce source water Cryptosporidium levels.
4) If
the Agency does not respond to a supplier regarding approval of a watershed
control plan submitted under this Section and the supplier meets the other
requirements of this Section, the watershed control program will be considered
approved and 0.5 log Cryptosporidium treatment credit will be awarded, unless
and until the Agency subsequently withdraws the approval by a SEP.
5) A
supplier must complete each of the following actions to maintain the 0.5-log
credit.
A) It
must submit an annual watershed control program status report to the Agency.
The annual watershed control program status report must describe the supplier's
implementation of the approved plan and assess the adequacy of the plan to meet
its goals. The report must explain how the supplier is addressing any
shortcomings in plan implementation, including those previously identified by
the Agency or as the result of the watershed survey conducted under subsection
(a)(5)(B). The report must also describe any significant changes that have
occurred in the watershed since the last watershed sanitary survey. If a supplier
determines during implementation that making a significant change to its
approved watershed control program is necessary, the supplier must notify the
Agency prior to making any such changes. If any change is likely to reduce the
level of source water protection, the supplier must also list in its
notification the actions the supplier will take to mitigate this effect;
B) The
supplier must undergo a watershed sanitary survey every three years for a CWS
supplier and every five years for a non-CWS supplier and submit the survey
report to the Agency. The survey must be conducted according to Agency
guidelines and by persons that the Agency approves.
i) The
watershed sanitary survey must meet the following criteria: it must encompass
the region identified in the Agency-approved watershed control plan as the area
of influence; assess the implementation of actions to reduce source water
Cryptosporidium levels; and identify any significant new sources of
Cryptosporidium.
ii) If
the Agency determines that significant changes may have occurred in the
watershed since the previous watershed sanitary survey, the supplier must
undergo another watershed sanitary survey before a date the Agency requires by
a SEP, which may be earlier than the regular date in subsection (a)(5)(B); and
C) The
supplier must make the watershed control plan, annual status reports, and
watershed sanitary survey reports available to the public upon request. These
documents must be in a plain language style and include criteria by which to
evaluate the success of the program in achieving plan goals. The Agency may,
by a SEP, approve that a supplier withhold from the public portions of the
annual status report, watershed control plan, and watershed sanitary survey
based on water supply security considerations.
6) If
the Agency determines that a supplier is not carrying out the approved
watershed control plan, the Agency may, by a SEP, withdraw the watershed
control program treatment credit.
b) Alternative
Source
1) A
supplier may conduct source water monitoring that reflects a different intake
location (either in the same source or for an alternate source) or a different
procedure for the timing or level of withdrawal from the source (alternative
source monitoring). If the Agency approves by a SEP, a supplier may determine
its bin classification under Section 611.1010 based on the alternative source
monitoring results.
2) If a
supplier conducts alternative source monitoring under subsection (b)(1), it
must also monitor their current plant intake concurrently as described in
Section 611.1001.
3) Alternative
source monitoring under subsection (b)(1) must meet the requirements for source
monitoring to determine bin classification, as described in Sections 611.1001
through 611.1006. A supplier must report the alternative source monitoring
results to the Agency, along with supporting information documenting the
operating conditions under which the samples were collected.
4) If a
supplier determines its bin classification under Section 611.1010 using
alternative source monitoring results that reflect a different intake location
or a different procedure for managing the timing or level of withdrawal from
the source, the supplier must relocate the intake or permanently adopt the
withdrawal procedure, as applicable, no later than the applicable treatment
compliance date in Section 611.1013.
BOARD NOTE: Derived from 40 CFR
141.716.