35 Ill. Adm. Code 611.1060
Violations
Section 611.1060 Violations
a) E.
coli MCL Violations. A supplier is in violation of the MCL for E. coli when
any of the conditions identified in subsections (a)(1) through (a)(4) occur.
1) The
supplier has an E. coli-positive repeat sample following a total
coliform-positive routine sample.
2) The
supplier has a total coliform-positive repeat sample following an E. coli-positive
routine sample.
3) The
supplier fails to take all required repeat samples following an E. coli-positive
routine sample.
4) The
supplier fails to test for E. coli when any repeat sample tests positive for
total coliform.
b) Treatment Technique
Violation
1) A
treatment technique violation occurs when a supplier exceeds a treatment
technique trigger specified in Section 611.1059(a) and then fails to conduct
the required assessment or corrective actions within the timeframe specified in
Section 611.1059(b) and (c).
2) A
treatment technique violation occurs when a seasonal system supplier fails to
complete an Agency-approved start-up procedure prior to serving water to the
public.
c) Monitoring Violations
1) Failure
to take every required routine or additional routine sample in a compliance
period is a monitoring violation.
2) Failure
to analyze for E. coli following a total coliform-positive routine sample is a
monitoring violation.
d) Reporting Violations
1) Failure
to submit a monitoring report or completed assessment form after a supplier
properly conducts monitoring or assessment in a timely manner is a reporting
violation.
2) Failure
to notify the Agency following an E. coli-positive sample as required by
Section 611.1058(b)(1) in a timely manner is a reporting violation.
3) Failure
to submit certification of completion of Agency-approved start-up procedure by
a seasonal system is a reporting violation.
BOARD NOTE: Derived from 40 CFR
141.860.