35 Ill. Adm. Code 615.446
Operating Requirements
Section 615
Section 615.446 Operating
Requirements
a) A person must not cause or allow incompatible materials to be
placed in the same surface impoundment unit.
b) A surface impoundment unit must be removed from service in
compliance
with subsection (c) when:
1) The level of liquids in the unit suddenly drops and the drop
is not known to be caused by changes in the flows into or out of the unit; or
2) The dike leaks.
c) When a surface impoundment unit must be removed from service
as required by subsection (b), the owner or operator must:
1) Shut off the flow or stop the addition of wastes into the
impoundment unit;
2) Contain any surface leakage that has occurred or is occurring;
3) Stop the leak;
4) Take any other necessary steps to stop or prevent catastrophic
failure;
5) If a leak cannot be stopped by any other means, empty the
impoundment unit; and
6) Notify the Agency of the removal from service and corrective
actions that were taken, such notice to be given within 10 days after the
removal from service.
d) No surface impoundment unit that has been removed from service
in
compliance
with the requirements
of this Section may be restored to service unless the portion of the unit that
failed has been repaired.
e) A surface impoundment unit that has been removed from service
in
compliance
with the requirements
of this Section and that is not being repaired must be closed in
compliance
with the provisions of Section
615.447.