35 Ill. Adm. Code 724.958
Standards: Pumps, Valves, Pressure Relief Devices, and Other Connectors
Section 724
Section 724.958Â Standards:Â
Pumps, Valves, Pressure Relief Devices, and Other Connectors
a)Â Â Â Â Â Â Â Â Pumps and valves in heavy liquid service, pressure relief
devices in light liquid or heavy liquid service and flanges and other
connectors must be monitored within five days by the method specified in
Section 724.963(b), if evidence of a potential leak is found by visual,
audible, olfactory, or any other detection method.
b)Â Â Â Â Â Â Â Â If an instrument reading of 10,000 ppm or greater is measured,
a leak is detected.
c)Â Â Â Â Â Â Â Â Repairs
1)Â Â Â Â Â Â Â Â When a leak is detected, it must be repaired as soon as
practicable, but not later than 15 calendar days after it is detected, except
as provided in Section 724.959.
2)Â Â Â Â Â Â Â Â The first attempt at repair must be made no later than five
calendar days after each leak is detected.
d)Â Â Â Â Â Â Â Â First attempts at repair include, but are not limited to, the
best practices described under Section 724.957(e).
e)Â Â Â Â Â Â Â Â Any connector that is inaccessible or is ceramic or
ceramic-lined (e.g., porcelain, glass, or glass-lined) is exempt from the
monitoring requirements of subsection (a) and from the recordkeeping requirements
of Section 724.964.