35 Ill. Adm. Code 725.354
Design and Operating Requirements
Section 725
Section 725.354Â Design and
Operating Requirements
The owner or operator of each
new waste pile on which construction commences after January 29, 1992, each
lateral expansion of a waste pile unit on which construction commences after
July 29, 1992, and each such replacement of an existing waste pile unit that is
to commence reuse after July 29, 1992, must install two or more liners and a
leachate collection and removal system above and between such liners and
operate the leachate collection and removal systems, in accordance with 35 Ill.
Adm. Code 724.351(c), unless exempted under 35 Ill. Adm. Code 724.351(d), (e)
or (f); and must comply with the procedures of Section 725.321(b).Â
"Construction commences" is as defined in 35 Ill. Adm. Code 720.110
under "existing facility". The owner or operator of each unit
referred to in this Section must notify the Agency at least sixty days prior to
receiving waste. The owner or operator of each facility submitting notice must
file a Part B application within six months after the receipt of such notice.