35 Ill. Adm. Code 725.982
Schedule for Implementation of Air Emission Standards
Section 725
Section 725.982Â Schedule for
Implementation of Air Emission Standards
a)Â Â Â Â Â Â Â Â This subsection (a) corresponds with 40 CFR 265.1082(a), which
required compliance before dates long past. This statement maintains
structural consistency with the corresponding federal rules.
b)Â Â Â Â Â Â Â Â An owner or operator of a facility or unit in existence on the
effective date of statutory or regulatory amendments under the Act that render
the facility subject to Subpart I, J, or K must meet the following
requirements:
1)Â Â Â Â Â Â Â Â The owner or operator must install and begin operation of all
control equipment required to comply with this Subpart CC and complete
modifications of production or treatment processes to satisfy exemption
criteria of Section 725.983(c) by the effective date of the amendment, except
as provided in subsection (b)(2).
2)Â Â Â Â Â Â Â Â When control equipment or waste management units required to
comply with this Subpart CC cannot be installed and begin operation or when
modifications of production or treatment processes to satisfy the exemption
criteria of Section 725.983(c) cannot be completed by the effective date of the
amendment, the owner or operator must undertake the following actions:
A)Â Â Â Â Â Â Â Install and begin operation of the control equipment or waste
management unit and complete modification of production or treatment processes
as soon as possible, but no later than 30 months after the effective date of
the amendment; and
B)Â Â Â Â Â Â Â Maintenance of Implementation Schedule
i)Â Â Â Â Â Â Â Â Â For facilities subject to the recordkeeping requirements of
Section 725.173, enter and maintain the implementation schedule specified in
subsection (a)(2)(B) in the operating record no later than the effective date
of the amendment, or
ii)Â Â Â Â Â Â Â Â For facilities not subject to Section 725.173, the owner or
operator must enter and maintain the implementation schedule specified in
subsection (a)(2)(B) in a permanent, readily available file located at the
facility site no later than the effective date of the amendment.
c)Â Â Â Â Â Â Â Â The owner or operator of a facility or unit that becomes newly
subject to the requirements of this Subpart CC due to an action other than
those described in subsection (b) must comply with all applicable requirements
immediately (i.e., the owner or operator must have control devices installed
and operating on the date the facility or unit becomes subject to the
requirements of this Subpart CC; the 30-month implementation schedule does not
apply to the owner or operator of such a facility).
d)Â Â Â Â Â Â Â Â This subsection (d) corresponds with 40 CFR 265.1082(d), which
allowed extension of a long-past compliance date. This statement maintains
structural consistency with the federal rule.