35 Ill. Adm. Code 730.132
Construction Requirements
Section 730
Section 730.132 Construction
Requirements
a) A new Class III injection well must be cased and cemented to
prevent the migration of fluids into or between underground sources of drinking
water. The Agency may waive the cementing requirements for a new well in
existing projects or portions of existing projects if it has substantial
evidence that no contamination of underground sources of drinking water would
result. The casing and cement used in the construction of each newly drilled
well must be designed for the life expectancy of the well. In determining and
specifying casing and cementing requirements, the following factors must be
considered:
1) The depth to the injection zone;
2) The injection pressure, external pressure, internal pressure,
axial loading, etc.;
3) The hole size;
4) The size and grade of all casing strings (wall thickness,
diameter, nominal weight, length, joint specification, and construction
material);
5) The corrosiveness of injected fluids and formation fluids;
6) The lithology of injection and confining zones; and
7) The type and grade of cement.
b) Appropriate logs and other tests must be conducted during the
drilling and construction of a new Class III injection well. A descriptive
report interpreting the results of such logs and tests must be prepared by a
knowledgeable log analyst and submitted to the Agency. The logs and tests
appropriate to each type of Class III injection well must be determined based
on the intended function, depth, construction, and other characteristics of the
well; the availability of similar data in the area of the drilling site; and
the need for additional information that may arise from time to time as the
construction of the well progresses. Deviation checks must be conducted on all
holes where pilot holes and reaming are used, unless the hole will be cased and
cemented by circulating cement to the surface. If deviation checks are
necessary, they must be conducted at sufficiently frequent intervals to assure
that vertical avenues for fluid migration in the form of diverging holes are
not created during drilling.
c) If the injection zone is a formation that is naturally
water-bearing, the following information concerning the injection zone must be
determined or calculated for a new Class III injection well or project:
1) The fluid pressure;
2) The fracture pressure; and
3) The physical and chemical characteristics of the formation
fluids.
d) If the injection formation is not a water-bearing formation,
the information in subsection (c)(2) must be submitted.
e) If injection is into a formation that contains water with less
than 10,000 mg/ℓ TDS, monitoring wells must be completed into the
injection zone and into any underground sources of drinking water above the
injection zone that could be affected by the mining operation. These wells must
be located in such a fashion as to detect any excursion of injection fluids,
process by-products, or formation fluids outside the mining area or zone. If
the operation may be affected by subsidence or catastrophic collapse, the
monitoring wells must be located so that they will not be physically affected.
f) If injection is into a formation that does not contain water
with less than 10,000 mg/ℓ TDS, no monitoring wells are necessary in the
injection stratum.
g) If the injection well penetrates a USDW in an area subject to
subsidence or catastrophic collapse, an adequate number of monitoring wells
must be completed into the USDW to detect any movement of injected fluids,
process by-products, or formation fluids into the USDW. The monitoring wells
must be located outside the physical influence of the subsidence or
catastrophic collapse.
h) In determining the number, location, construction, and
frequency of monitoring of the monitoring wells the following criteria must be
considered:
1) The population relying on the USDW affected or potentially
affected by the injection operation;
2) The proximity of the injection operation to points of withdrawal
of drinking water;
3) The local geology and hydrology;
4) The operating pressures and whether a negative pressure
gradient is being maintained;
5) The nature and volume of the injected fluid, the formation
water, and the process by-products; and
6) The injection well density.