35 Ill. Adm. Code 807.624
Interim Formula for Cost Estimate
Section 807
Section 807.624Â Interim
Formula for Cost Estimate
a)Â Â Â Â Â Â Â Â An operator may temporarily utilize the formula of this
Section for preparing a cost estimate instead of preparing a cost estimate
based on closure and post-closure care plans. No permit application filed
after March 1, 1985 may utilize this formula. Each operator must file an
application to modify the site permit to include closure and post-closure care
plans and cost estimates by March 1, 1988.
b)Â Â Â Â Â Â Â Â References to closure and post-closure care plans in financial
assurance instruments shall be construed to refer to the closure and
post-closure care requirements of this Part and the permit for the site.
c)Â Â Â Â Â Â Â Â This formula may not be utilized in lieu of the plans and cost
estimates required under 35 Ill. Reg. Adm. Code 724 and 725.
d)Â Â Â Â Â Â Â Â The following abbreviations and symbols are used in the
formula:
1)Â Â Â Â Â Â Â Â AWR:Â Annual waste received at the site in cubic yards.
2)Â Â Â Â Â Â Â Â AD:Â Average depth of the landfill in feet.
3)Â Â Â Â Â Â Â Â Y:Â Years expected to lapse between cessation of application
of cover by the operator and implementation of site clean-up by the Agency. Y
is assumed to be three years.
4)Â Â Â Â Â Â Â Â CPA:Â Cost per acre of placing final cover, grading, seeding
and venting. CPA is assumed to be $5000/acre.
5)Â Â Â Â Â Â Â Â A:Â Area requiring final cover in acres.
6)Â Â Â Â Â Â Â Â P:Â Fraction of final cover expected to require subsidence or
erosion control each year. P is assumed to be 0.05.
7)Â Â Â Â Â Â Â Â M:Â Number of monitoring wells existing or required in the
permit. M cannot be less than three.
8)Â Â Â Â Â Â Â Â CE:Â Cost estimate in dollars.
e)Â Â Â Â Â Â Â Â Area requiring final cover
1)Â Â Â Â Â Â Â Â A(1) is the total area which has received waste but which has
not received final cover in accordance with Section 807.305(c) as of January 1,
1985.
2)Â Â Â Â Â Â Â Â A(2) is the total area which would require final cover after Y
years of uncontrolled operation according to the following formula:
A(2)
=
(Y)(A
WR)
=
3
AWR
3200
(AD)
3200
AD
3)Â Â Â Â Â Â Â Â A(3) = A(1) + A(2)
4)Â Â Â Â Â Â Â Â A(4) is the total permitted area which has not received final
cover in accordance with Section 807.305(c) as of January 1, 1985
5)Â Â Â Â Â Â Â Â Area requiring final cover (A) is the smaller of A(3) or A(4)
f)Â Â Â Â Â Â Â Â Cost estimate (dollars)
CE = (CPA)(A) + 3((CPA)(P)(A) + 600(M))
= 5750A + 1800M