35 Ill. Adm. Code 820.303
Processing Program
Section 820.303Â Processing Program
a)Â Â Â Â Â Â Â Â The
owner or operator of a GCDD recovery facility must inspect every load of
material transported to the GCDD recovery facility to ensure only GCDD is
accepted at the GCDD recovery facility.
1)Â Â Â Â Â Â Â Â Each
load inspection must include:
A)Â Â Â Â Â Â Â Before
acceptance, an inspection of each load using an elevated structure, a
designated ground-level inspection area, or another acceptable method specified
in a permit issued under this Part.
B)Â Â Â Â Â Â Â Maintaining
documentation reflecting the results of each load inspection, including the
date the load was received, the amount of GCDD, the name of the transporter,
the name of the generator, the location of the site of origin of the material,
whether the load was accepted or rejected, and the name of the facility
inspector.
2)Â Â Â Â Â Â Â Â Loads
of material other than GCDD delivered to the GCDD recovery
facility must
be rejected. The driver of the rejected load must be presented with a written
notice that includes the following:
A)Â Â Â Â Â Â Â The
date of the attempted delivery;
B)Â Â Â Â Â Â Â A
statement that only GCDD is accepted at the GCDD recovery
facility;
C)Â Â Â Â Â Â Â The
reasons for rejecting the load; and
D)Â Â Â Â Â Â Â A copy
of the rejection notice must be maintained in compliance with Section 820.304.
3)Â Â Â Â Â Â Â Â If
material other than GCDD is discovered to have been accepted at the
GCDD
recovery facility, the material must be removed in compliance with this Subpart.
b)Â Â Â Â Â Â Â Â Before
any mechanical sorting, separating, grinding, or other processing, all drywall
and other wallboard containing gypsum or sulfur must be removed from the GCDD
received to the extent practicable. The drywall and other wallboard containing
gypsum or sulfur must be stored in closed, structurally sound, non-leaking
containers that are in good condition (e.g., no severe rusting, apparent
structural defects, or deterioration), prevent the infiltration of
precipitation, and prevent releases during storage, handling, and
transportation.
1)
If being recycled, the drywall and other wallboard containing gypsum or
sulfur must be transported off-site within 45 calendar days after receipt.
2)
If not being recycled, the drywall and other wallboard containing gypsum
or sulfur must be transported off-site within 72 hours after receipt.
c)Â Â Â Â Â Â Â Â Acceptable
Materials
1)Â Â Â Â Â Â Â Â Within
48 hours after receipt of the
GCDD
at the GCDD
recovery facility, the owner or operator must sort the GCDD to separate the
recyclable GCDD and
wood being recovered for use as fue
l
from all other GCDD.
2)Â Â Â Â Â Â Â Â All
putrescible recyclable GCDD and all wood recovered for use as fuel that is
separated from other GCDD must be transported off-site within 45 calendar days
after receipt.
3)Â Â Â Â Â Â Â Â All
non-putrescible recyclable GCDD that is separated from other GCDD must be
transported off-site within six months after receipt.
4)Â Â Â Â Â Â Â Â All
GCDD other than the separated recyclable GCDD and wood being recovered for use
as fuel must be stored in containers meeting the requirements of subsection (b)
and, within 72 hours after receipt, must be transported off-site for disposal.
5)Â Â Â Â Â Â Â Â CCDD
and uncontaminated soil that is separated from GCDD received at the GCDD
recovery facility may be transported off-site for use complying with the Act
and rules adopted under the Act.
d)Â Â Â Â Â Â Â Â Unacceptable
Materials. Any unacceptable materials discovered to be mixed with GCDD after
it is accepted at the GCDD recovery facility must be immediately separated from
the GCDD and removed from the GCDD recovery facility within 72 hours after
receipt. The separated unacceptable material must be managed as follows:
1)Â Â Â Â Â Â Â Â Landscape
waste must be transported to a facility permitted to accept landscape waste.
2)Â Â Â Â Â Â Â Â Lead-acid
batteries must be transported either to a drop-off center handling the waste or
to a lead-acid battery retailer.
3)Â Â Â Â Â Â Â Â Lithium-ion
batteries must be transported to a facility capable of handling the waste.
4)Â Â Â Â Â Â Â Â Special
wastes must be containerized separately and removed from the facility as soon
as possible by an appropriately licensed special waste hauler. Special wastes
must be transported to a GCDD recovery facility permitted to accept special
waste.
5)Â Â Â Â Â Â Â Â Asbestos
and asbestos debris must be managed in compliance with the National Emission
Standards for Hazardous Air Pollutants (NESHAP) regulations.
6)Â Â Â Â Â Â Â Â Used
and waste tires must be managed in compliance with Title XVI of the Act.
7)Â Â Â Â Â Â Â Â White
good components must be managed in compliance with Section 22.28 of the Act.
8)Â Â Â Â Â Â Â Â All
other unacceptable materials must be managed in compliance with 35 Ill. Adm.
Code Subtitle G.
9)Â Â Â Â Â Â Â Â Documentation
must be maintained reflecting each type of unacceptable material managed under
subsections (d)(1) through (d)(8), including: the date the material was
received, identified, and separated; the date the material was transported
offsite; the amount of unacceptable material; the name of the transporter; the
name of the generator; and the name of the offsite facility receiving the
unacceptable material.