35 Ill. Adm. Code 840.126
Final Cover System
Section 840.126 Final Cover
System
The owner or operator of Ash
Pond D must design and install a final cover system for Ash Pond D. The final
cover system must consist of a low permeability layer and a final protective
layer.
a) Standards for the low permeability layer. The low permeability
layer must be designed to minimize surface infiltration and must consist of a
geosynthetic membrane cover and be constructed in accordance with the following
standards:
1) The geosynthetic membrane must have a minimum thickness of 40
mil (0.04 inches) and, in terms of hydraulic flux, be equivalent or superior to
a 3 foot layer of soil with a hydraulic conductivity of I x 10
-7
centimeters
per second.
2) The geosynthetic membrane must be placed over a prepared base
free from sharp objects and other materials that may cause damage.
b) Standards for the final protective layer. The final
protective layer must:
1) Cover the entire geosynthetic membrane.
2) Be at least 3 feet thick and must be sufficient to protect the
geosynthetic membrane from freezing and minimize root penetration of the
geosynthetic membrane.
3) Consist of soil material capable of supporting vegetation.
4) Be placed as soon as possible after placement of the
geosynthetic membrane.
5) Be covered with vegetation to minimize wind and water erosion.
c) Construction Quality Assurance Program. The final cover system
must be constructed according to a construction quality assurance program that
meets the requirements of Section 840.146 of this Subpart.