35 Ill. Adm. Code 845.400
Liner Design Criteria for Existing CCR Surface Impoundments
Section 845.400 Liner Design Criteria for Existing CCR
Surface Impoundments
a) An
existing CCR surface impoundment is considered to be an existing lined surface
impoundment if it has been constructed with either a composite liner that meets
the requirements of subsection (b) or an alternative composite liner that meets
the requirements of subsection (c).
b) Composite
Liner
1) A composite
liner must consist of two components: the upper component consisting of, at a
minimum, a 30-mil geomembrane liner, and the lower component consisting of at
least a two-foot layer of compacted soil with a hydraulic conductivity of no
more than 1 x 10
‑7
centimeters per second (cm/sec). The
geomembrane liner components consisting of high-density polyethylene (HDPE)
must be at least 60 mil. The geomembrane liner or upper liner component must
be installed in direct and uniform contact with the compacted soil or lower
liner component.
2) The
composite liner must be:
A) Constructed
of materials that have appropriate chemical properties and sufficient strength
and thickness to prevent failure due to pressure gradients (including static
head and external hydrogeologic forces), physical contact with the CCR or
leachate to which they are exposed, climatic conditions, the stress of
installation, and the stress of daily operation;
B) Constructed
of materials that provide appropriate shear resistance of the upper and lower
component interface to prevent sliding of the upper component, including on
slopes;
C) Placed
upon a foundation or base capable of providing support to the liner and
resistance to pressure gradients above and below the liner to prevent failure
of the liner due to settlement, compression, or uplift; and
D) Installed
to cover all surrounding earth likely to be in contact with the CCR or
leachate.
c) Alternative Composite
Liner
1) An
alternative composite liner must consist of two components: the upper component
consisting of, at a minimum, a 30-mil geomembrane liner, and a lower component,
that is not a geomembrane, with a liquid flow rate no greater than the liquid
flow rate of two feet of compacted soil with a hydraulic conductivity of no
more than 1 x 10
‑7
cm/sec. The geomembrane liner components
consisting of high-density polyethylene (HDPE) must be at least 60 mil. If the
lower component of the alternative liner is compacted soil, the geomembrane
liner must be installed in direct and uniform contact with the compacted soil.
2) The
liquid flow rate through the lower component of the alternative composite liner
must be no greater than the liquid flow rate through two feet of compacted soil
with a hydraulic conductivity of 1 x 10
‑7
cm/sec. The
hydraulic conductivity for the two feet of compacted soil used in the
comparison must be no greater than 1 x 10
‑7
cm/sec. The
hydraulic conductivity of any alternative to the two feet of compacted soil
must be determined using recognized and generally accepted methods.
3) The
liquid flow rate comparison must be made using the following equation, which is
derived from Darcy's Law for gravity flow through porous media.
Q/A = q = k
((h/t)+1)
Where:
Q = flow rate
(cubic centimeters/second)
A = Surface area
of the liner (squared centimeters)
q = flow rate
per unit area (cubic centimeters/ second/squared centimeter)
k = hydraulic
conductivity of the liner (centimeters /second)
h = hydraulic
head above the liner (centimeters); and
t = thickness of
the liner (centimeters)
4) The
alternative composite liner must meet the requirements specified in subsection
(b).
d) The hydraulic conductivity of the compacted soil
must be determined using recognized and generally accepted methods.
e) The
owner or operator of an existing CCR surface impoundment that has not completed
an Agency approved closure before July 30, 2021 must submit an initial
operating permit application under Section 845.230 that demonstrates whether
the CCR surface impoundment was constructed with either of the following:
1) A
composite liner that meets the requirements of subsection (b); or
2) An
alternative composite liner that meets the requirements of subsection (c).
f) A CCR
surface impoundment is considered to be an unlined CCR surface impoundment if
either:
1) The
owner or operator of the CCR surface impoundment determines that the CCR
surface impoundment is not constructed with a liner that meets the requirements
of subsection (b) or (c); or
2) The
owner or operator of the CCR surface impoundment fails to document whether the
CCR surface impoundment was constructed with a liner that meets the
requirements of subsection (b) or (c).
g) All
unlined CCR surface impoundments are subject to the requirements of Section 845.700.
h)
The owner or operator of the CCR surface impoundment must
obtain a certification from a qualified professional engineer attesting that
the CCR surface impoundment meets the requirements of subsection (a) and submit
the certification to the Agency in the facility's initial operating permit
application.