35 Ill. Adm. Code 845.410
Liner Design Criteria for New CCR Surface Impoundments and Any Lateral Expansion of a CCR Surface Impoundment
Section 845.410 Liner Design Criteria for New CCR
Surface Impoundments and Any Lateral Expansion of a CCR Surface Impoundment
a) New
CCR surface impoundments and lateral expansions of existing and new CCR surface
impoundments must be designed, constructed, operated, and maintained with
either a composite liner or an alternative composite liner that meets the
requirements of Section 845.400(b) or (c).
b) Any
liner specified in this Section must be installed to cover all surrounding
earth likely to be in contact with CCR. Dikes must not be constructed so as to
damage the composite liner.
c)
Before construction, the owner or operator must obtain
certification from a qualified professional engineer that the design of the
composite liner or, if applicable, the design of an alternative composite liner
complies with the requirements of this Section and submit this certification to
the Agency in the facility's construction permit application.
d)
Upon completion of construction, the owner or operator must
obtain a certification from a qualified professional engineer that the
composite liner or, if applicable, the alternative composite liner has been
constructed in accordance with the requirements of this Section and submit this
certification to the Agency in the facility's initial operating permit
application.