35 Ill. Adm. Code 845.630
Groundwater Monitoring Systems
Section 845.630
Groundwater Monitoring Systems
a) Performance
Standard. The owner or operator of a CCR surface impoundment must install a
groundwater monitoring system that consists of a sufficient number of wells,
installed at appropriate locations and depths, to yield groundwater samples
that:
1)
Accurately represent
the quality of background groundwater that has not been affected by leakage
from a CCR surface impoundment.
A determination of background quality may
include sampling of wells that are not hydraulically upgradient of the CCR
management area where:
A) Hydrogeologic
conditions do not allow the owner or operator of the CCR surface impoundment to
determine what wells are hydraulically upgradient; or
B) Sampling
at other wells will provide an indication of background groundwater quality
that is demonstratively as representative or more representative than that
provided by the upgradient wells; and
2) Accurately
represent the quality of groundwater passing the waste boundary of the CCR
surface impoundment. The downgradient monitoring system must be installed at
the waste boundary that ensures detection of groundwater contamination. All
potential contaminant pathways must be monitored.
b) The
number, spacing, and depths of monitoring system wells must be determined based
upon site-specific technical information identified in the hydrogeologic site
characterization conducted under Section 845.620.
c) The
groundwater monitoring system must include a sufficient number of monitoring
wells necessary to meet the performance standards specified in subsection (a)
based on the site-specific information specified in subsection (b). The
groundwater monitoring system must contain:
1) A
minimum of one upgradient and three downgradient monitoring wells; and
2) Additional
monitoring wells as necessary to accurately represent the quality of background
groundwater that has not been affected by leakage from the CCR surface
impoundment and the quality of groundwater passing the waste boundary of the
CCR surface impoundment.
d) Multiunit
Groundwater Monitoring System
1) The
owner or operator of multiple CCR surface impoundments may install a multiunit
groundwater monitoring system instead of separate groundwater monitoring
systems for each CCR surface impoundment.
2) The
multiunit groundwater monitoring system must be equally as capable of detecting
monitored constituents at the waste boundary of the CCR surface impoundment as
the individual groundwater monitoring system specified in subsections (a)
through (c) for each CCR surface impoundment, based on the following factors:
A) Number,
spacing, and orientation of each CCR surface impoundment;
B) Hydrogeologic
setting;
C) Site
history; and
D) Engineering
design of the CCR surface impoundment.
e) Monitoring
wells must be properly constructed in a manner consistent with the standards of
77 Ill. Adm. Code 920.170.
1) The
owner or operator must document and include in the facility's operating record
the design, installation, development, and decommissioning of any monitoring
wells, piezometers and other measurement, sampling, and analytical devices.
The qualified professional engineer must be given access to this documentation
when completing the groundwater monitoring system certification required by
subsection (g).
2) The
monitoring wells, piezometers, and other measurement, sampling, and analytical
devices must be operated and maintained so that they perform to the design
specifications throughout the life of the monitoring program.
f) The
owner or operator of a new CCR surface impoundment must submit a construction
permit application containing documentation showing that the groundwater
monitoring system is designed to meet the requirements of this Section. The
owner or operator of all CCR surface impoundments must submit an operating
permit application containing documentation showing that the groundwater
monitoring system has been constructed to meet the requirements of this Section.
g) The
owner or operator must obtain a certification from a qualified professional
engineer stating that the groundwater monitoring system has been designed and
constructed to meet the requirements of this Section. If the groundwater
monitoring system includes the minimum number of monitoring wells specified in
subsection (c)(1), the certification must document the basis supporting this
determination. The certification must be submitted to the Agency with the
appropriate permit application.