35 Ill. Adm. Code 845.640
Groundwater Sampling and Analysis Requirements
Section 845.640 Groundwater
Sampling and Analysis Requirements
a) The
groundwater monitoring program must include consistent sampling and analysis
procedures that are designed to ensure monitoring results that provide an
accurate representation of groundwater quality at the background and
downgradient wells required by Section 845.630. The owner or operator of the
CCR surface impoundment must develop a sampling and analysis program that
includes procedures and techniques for:
1) Sample collection;
2) Sample preservation and
shipment;
3) Analytical procedures;
4) Chain of custody
control; and
5) Quality assurance and
quality control.
b) The
groundwater monitoring program must include sampling and analytical methods
that are appropriate for groundwater sampling and that accurately measure
constituents and other monitoring parameters in groundwater samples. For
purposes of this Subpart, the term
"constituent"
refers to both constituents and other monitoring parameters listed in Section
845.600.
c) The
owner or operator must perform the following each time ground water is sampled:
1) Measure
groundwater elevations in each well before purging;
2) Determine
the rate and direction of groundwater flow; and
3) Measure
groundwater elevations in wells that monitor the same CCR management area
within a time period short enough to avoid temporal variations in groundwater
flow that could preclude accurate determination of groundwater flow rate and
direction.
d) The owner
or operator of the CCR surface impoundment must establish background
groundwater quality in a hydraulically upgradient or background well for each
of the constituents listed in Section 845.600. Background groundwater quality
may be established at wells that are not located hydraulically upgradient from
the CCR surface impoundment if it meets the requirements of Section
845.630(a)(1).
e) The
number of samples collected when conducting monitoring (for both downgradient
and background wells) must be consistent with the statistical procedures chosen
under subsection (f) and the performance standards under subsection (g). The
sampling procedures must be those specified by Section 845.650(a) through (c).
f) Statistical
Methods
1) The
owner or operator of the CCR surface impoundment must select one of the
statistical methods specified in subsection (f)(1) to be used in evaluating
groundwater monitoring data for each specified constituent. The statistical
test chosen must be conducted separately for each constituent in each
monitoring well.
A) A
parametric analysis of variance followed by multiple comparison procedures to
identify statistically significant evidence of contamination. The method must
include estimation and testing of the contrasts between each compliance well's
mean and the background mean levels for each constituent.
B) An
analysis of variance based on ranks followed by multiple comparison procedures
to identify statistically significant evidence of contamination. The method
must include estimation and testing of the contrasts between each compliance
well's median and the background median levels for each constituent.
C) A
tolerance or prediction interval procedure, in which an interval for each
constituent is established from the distribution of the background data and the
level of each constituent in each compliance well is compared to the upper
tolerance or prediction limit.
D) A
control chart approach that gives control limits for each constituent.
E) Another
statistical test method that meets the performance standards of subsection (g).
2) The
owner or operator of the CCR surface impoundment must
obtain
a certification from a qualified professional engineer stating that the
selected statistical method is appropriate for evaluating the groundwater
monitoring data for the CCR surface impoundment. The certification must
include a narrative description of the statistical method selected to evaluate
the groundwater monitoring data.
The certification must be submitted to
the Agency with the appropriate permit application.
3) The
owner or operator of the CCR surface impoundment must submit the following to
the Agency in an operating permit application:
A) Documentation of the
statistical method chosen; and
B) The
qualified professional engineer certification required by subsection (f)(2).
g) Any
statistical method chosen under subsection (f) must comply with the following
performance standards, as appropriate, based on the statistical test method
used:
1) The statistical
method used to evaluate groundwater monitoring data must be appropriate for the
distribution of constituents. Normal distributions of data values must use
parametric methods. Non-normal distributions must use non-parametric methods.
If the distribution of the constituents is shown by the owner or operator of
the CCR surface impoundment to be inappropriate for a normal theory test, then
the data must be transformed or a distribution-free (non-parametric) theory
test must be used. If the distributions for the constituents differ, more than
one statistical method may be needed.
2) If an
individual well comparison procedure is used to compare an individual
compliance well constituent concentration with background constituent
concentrations or a groundwater protection standard, the test must be done at a
Type I error level of at least 0.01 for each testing period. If a multiple
comparison procedure is used, the Type I experiment wise error rate for each
testing period must be at least 0.05; however, the Type I error of at least
0.01 for individual well comparisons must be maintained. This performance
standard does not apply to tolerance intervals, prediction intervals, or
control charts.
3) If a
control chart approach is used to evaluate groundwater monitoring data, the
specific type of control chart and its associated constituent values must be
such that this approach is at least as effective as any other approach in this
Section for evaluating groundwater data. The constituent values must be determined
after considering the number of samples in the background database, the data
distribution, and the range of the concentration values for each constituent of
concern.
4) If a
tolerance interval or a prediction interval is used to evaluate groundwater
monitoring data, the levels of confidence and, for tolerance intervals, the
percentage of the population that the interval must contain, must be such that
this approach is at least as effective as any other approach in this Section
for evaluating groundwater data. These constituents must be determined after
considering the number of samples in the background database, the data
distribution, and the range of the concentration values for each constituent of
concern.
5) The
statistical method must account for data below the limit of detection with one
or more statistical procedures at least as effective as any other approach in
this Section for evaluating groundwater data. Any practical quantitation limit
that is used in the statistical method must be the lowest concentration level
that can be reliably achieved within specified limits of precision and accuracy
during routine laboratory operating conditions that are available to the
facility. For the constituents identified in Section 845.600(a)(1), the practical
quantitation limit must be less than the groundwater protection standards.
6) If
necessary, the statistical method must include procedures to control or correct
for seasonal and spatial variability as well as temporal correlation in the
data.
h) The
owner or operator of the CCR surface impoundment must determine whether there
is a statistically significant increase over background values for each
constituent in Section 845.600.
1) In
determining whether a statistically significant increase has occurred, the
owner or operator must compare the groundwater quality of each constituent at
each monitoring well designated under Section 845.630(a)(2) or (d)(1) to the
background value of that constituent, according to the statistical procedures
and performance standards specified by subsections (f) and (g).
2) Within
60 days after completing sampling and analysis, the owner or operator must
determine whether there has been a statistically significant increase over
background for any constituent at each monitoring well.
i) The
owner or operator must measure total recoverable metals concentrations in
measuring groundwater quality. Measurement of total recoverable metals
captures both the particulate fraction and dissolved fraction of metals in
natural waters. Groundwater samples must not be field filtered before analysis.
j) All
groundwater samples taken under this Subpart must be analyzed by a certified
laboratory using Test Methods for Evaluating Solid Waste, Physical/Chemical
Methods, SW-846
,
incorporated by reference in
Section 845.150.