35 Ill. Adm. Code 845.750
Closure with a Final Cover System
Section 845.750 Closure with a
Final Cover System
Closure Performance Standard When Leaving CCR in Place
a) The
owner or operator of a CCR surface impoundment must ensure that, at a minimum,
the CCR surface impoundment is closed in a manner that will:
1) Control,
minimize or eliminate, to the maximum extent feasible, post-closure
infiltration of liquids into the waste and releases of CCR, leachate, or
contaminated run-off to the ground or surface waters or to the atmosphere;
2) Preclude
the probability of future impoundment of water, sediment, or slurry;
3) Include
measures that provide for major slope stability to prevent the sloughing or
movement of the final cover system during the closure and post-closure care
period;
4) Minimize
the need for further maintenance of the CCR surface impoundment; and
5) Be
completed in the shortest amount of time consistent with recognized and
generally accepted engineering practices.
b) Drainage
and Stabilization of CCR Surface Impoundments. The owner or operator of a CCR
surface impoundment or any lateral expansion of a CCR surface impoundment must
meet the requirements of this subsection (b) before installing the final cover
system required by subsection (c).
1) Free
liquids must be eliminated by removing liquid wastes or solidifying the
remaining wastes and waste residues.
2) Remaining
wastes must be stabilized sufficiently to support the final cover system.
c)
Final Cover System.
If a CCR surface impoundment is closed by leaving CCR in place, the owner or
operator must install a final cover system that is designed to minimize
infiltration and erosion, and, at a minimum, meets the requirements of this
subsection (c). The final cover system must consist of a low permeability
layer and a final protective layer. The design of the final cover system must
be included in the preliminary and final written closure plans required by
Section 845.720 and the construction permit application for closure submitted
to the Agency.
1) Standards
for the Low Permeability Layer. The low permeability layer must have a
permeability less
than or equal to the permeability of any bottom liner system or natural
subsoils present, or a hydraulic conductivity no greater than 1 x 10
‑7
cm/sec, whichever is less. The low permeability layer must be constructed in
accordance with the standards in either subsection (c)(1)(A) or (c)(1)(B),
unless the owner or operator demonstrates that another low permeability layer
construction technique or material provides equivalent or superior performance
to the requirements of either subsection (c)(1)(A) or (c)(1)(B) and is approved
by the Agency.
A) A
compacted earth layer constructed in accordance with the following standards:
i) The
minimum allowable thickness must be 0.91 meter (three feet); and
ii) The
layer must be compacted to achieve a hydraulic conductivity of 1 x 10
‑7
cm/sec or less and minimize void spaces.
B) A
geomembrane constructed in accordance with the following standards:
i) The
geosynthetic membrane must have a minimum thickness of 40 mil (0.04 inches)
and, in terms of hydraulic flux, must be equivalent or superior to a three-foot
layer of soil with a hydraulic conductivity of 1 x 10
‑7
cm/sec;
ii) The
geomembrane must have strength to withstand the normal stresses imposed by the
waste stabilization process; and
iii) The
geomembrane must be placed over a prepared base free from sharp objects and
other materials that may cause damage.
2) Standards
for the Final Protective Layer. The final protective layer must meet the
following requirements, unless the owner or operator demonstrates that another
final protective layer construction technique or material provides equivalent
or superior performance to the requirements of this subsection (c)(2) and is
approved by the Agency.
A) Cover the entire low
permeability layer;
B) Be at
least three feet thick, be sufficient to protect the low permeability layer
from freezing, and minimize root penetration of the low permeability layer;
C) Consist of soil material
capable of supporting vegetation;
D) Be
placed as soon as possible after placement of the low permeability layer; and
E) Be covered with
vegetation to minimize wind and water erosion.
3) The
disruption of the integrity of the final cover system must be minimized through
a design that accommodates settling and subsidence.
4) The
owner or operator of the CCR surface impoundment must obtain and submit with
its construction permit application for closure a written certification from a
qualified professional engineer that the design of the final cover system meets
the requirements of this Section.
d) This
subsection specifies the allowable uses of CCR in the closure of CCR surface
impoundments closing under Section 845.700. Notwithstanding the prohibition on
further placement in Section 845.700, CCR may be placed in these surface
impoundments, but only for purposes of grading and contouring in the design and
construction of the final cover system, if:
1) The
CCR placed was generated at the facility and is located at the facility at the
time closure was initiated;
2) CCR is
placed entirely above the elevation of CCR in the surface impoundment,
following dewatering and stabilization (see subsection (b));
3) The
CCR is placed entirely within the perimeter berms of the CCR surface
impoundment; and
4) The
final cover system is constructed with either:
A)
A
slope not steeper than 5% grade after allowance for settlement; or
B)
At
a steeper grade, if the Agency determines that the steeper slope is necessary,
based on conditions at the site, to facilitate run-off and minimize erosion,
and that side slopes are evaluated for erosion potential based on a stability
analysis to evaluate possible erosion potential. The stability analysis, at a
minimum, must evaluate the site geology; characterize soil shear strength;
construct a slope stability model; establish groundwater and seepage
conditions, if any; select loading conditions; locate critical failure surface;
and iterate until minimum factor of safety is achieved.