44 Ill. Adm. Code 8.3080
Evaluation Procedures
Section 8.3080Â Evaluation Procedures
a)Â Â Â Â Â Â Â Â In
making its recommendations, the selection committee may consider, among other
factors:
1)Â Â Â Â Â Â Â Â The A/E's or CM's
qualifications.
2)Â Â Â Â Â Â Â Â The ability of
professional personnel submitted by the A/E or CM.
3)Â Â Â Â Â Â Â Â The A/E's or CM's past
record and experience.
4)Â Â Â Â Â Â Â Â The
prior performance of the A/E or CM on CDB professional services agreements.Â
For CMs, this shall be determined by review of the CM Performance Evaluations
on previous CM projects, Performance Evaluations of the CM vendor on projects
in which it participated as an A/E or contractor, and any other related
material.
A)Â Â Â Â Â Â Â CDB
shall evaluate the performance of each firm upon completion of a contract.Â
Evaluations shall be made available to the firm and the firm may submit a
written response, with the evaluation and response retained solely by
CDB
.Â
The evaluation and response shall not be made available to any other person or
firm and is exempt from disclosure under the Freedom of Information Act
[5
ILCS 140].
The evaluation shall be based on the terms identified in the
construction manager's contract.
[30 ILCS 500/33-45]
B)Â Â Â Â Â Â Â In
addition to subsection (a)(4)(A), CDB reserves the right to evaluate a firm
during a project, when performance issues warrant that action.
C)Â Â Â Â Â Â Â Any
firm receiving a negative evaluation at any time during a project shall be
notified of such evaluation within seven days of its issuance.
5)Â Â Â Â Â Â Â Â The willingness of the vendor
to meet time requirements.
6)Â Â Â Â Â Â Â Â The location of the
project relative to the vendor's place of business.
7)Â Â Â Â Â Â Â Â The results of
preliminary evaluations performed by CDB staff.
8)Â Â Â Â Â Â Â Â The
current work load of the A/Es or CMs and their prior selections by CDB. This
determination shall be in writing and be reviewed by the CPO.
9)Â Â Â Â Â Â Â Â Professional references
for work performed on similar projects.
10)Â Â Â Â Â Â Â Â Interviews
conducted with the A/Es or CMs.
11)Â Â Â Â Â Â Â Â Minority,
female and veterans business goals of programs set out in 44 Ill. Adm. Code
1000.140 and 44 Ill. Adm. Code 20.
b)Â Â Â Â Â Â Â Â Before
beginning review of a CM's statement of qualifications, the committee shall
prepare a table of the factors on which the CMs will be rated and the weight to
be assigned to each factor. The table of factors, and the scores of each
reviewed submittal, will be kept on file for no less than 2 years from the date
of the selection.
c)Â Â Â Â Â Â Â Â In no
case shall the committee, prior to selecting an A/E or CM for negotiation, seek
formal or informal submission of verbal or written estimates of costs or
proposals in terms of dollars, hours required, percentage of construction cost,
or any other measure of compensation. Submission of pricing information in a
separate envelope to be opened at a later time shall not be allowed.