14 Ill. Adm. Code 710.50
Form of Grant Applications
Section 710.50 Form of Grant Applications
a) The
Department will publish, for at least 30 calendar days, a Notice of Funding
Opportunity on the GATA Grantee Portal (https://grants.illinois.gov/portal/)
.
b) The
applicants will be required to submit an application package to the Department,
which will include the following:
1) Uniform
grant application;
2) Uniform
budget template;
3) Conflict
of interest disclosure form;
4) Mandatory
disclosures form;
5) Project
narrative, which shall include the following information:
A) A
justification for developing an energy storage facility at the proposed site,
including:
i) How
the applicant will engage with the local community during and after
construction and how the energy storage project will help the local community;
ii) A
description of a plan or commitment to ecological site improvement (e.g.,
installation of native pollinator plantings equivalent to minimum standards
defined in the Illinois Department of Natural Resources "Solar Site
Pollinator Scorecard");
B) A
description of the applicant's ability to successfully complete the project for
which funds are intended, including:
i) A
description of the applicant's experience in the development of energy storage
facilities, how many energy storage facilities the applicant currently has in
commercial operation and how many are currently under construction. The
applicant or major contractor partner should provide at least three client
references for energy storage facilities that are complete and operating, sized
5 megawatt hours (MWh) or larger.
ii) Anticipated
timelines for construction and expected date for commercial operation launch.
The owner of the proposed energy storage facility must commit to placing the
energy storage facility into commercial operation on
either June 1, 2023,
June 1, 2024 or June 1, 2025, with such date subject to adjustment as needed
due to any delays in completing the grant contracting process, in finalizing
interconnection agreements and in installing interconnection facilities, and in
obtaining necessary governmental permits and approvals
. [20 ILCS
3855/1075(c-5)(8)]
iii) Expected
capacity of the energy storage facility in megawatts at the site of the
proposed energy storage facility.
iv) A
technology description that defines the energy storage type (e.g., battery,
hydrogen fuel cell) and summarizing the key components and the design of the
overall system.
v) A
summary of additional key technical characteristics, including:
• Energy
storage capacity or the maximum amount of stored energy, in megawatt hours
(MWh).
• Storage
duration or the amount of time stored energy can discharge at the rated power
capacity before depleting the system's energy capacity, in hours.
• Expected
system life, in years, based on anticipated operating conditions.
• Estimated
energy storage in the first 12 months of system operation, including, Alternating
Current (AC) energy (in MWh) for system charging and AC energy (in MWh)
discharging from the system to the grid.
• Estimated
annual system degradation rate, as a percentage, based on annual reduction in
the system's energy capacity.
vi) Documentation,
including production technical specification sheets, that provides the basis
for key technical characteristics described in this subsection.
C) A
description of the applicant's ability and strategy to meet the commitments and
agreements listed as criteria for receipt of a grant in 20 ILCS
3855/1-75(c-5)(10)(C). The applicant should:
i) Explain
the applicant's plan for ensuring the energy storage facility will be
constructed or installed by a qualified entity or entities consistent with the
requirements of the Public Utilities Act [220 ILCS 5/16-128A(g)] and any rules
adopted under that Section;
ii) Describe
existing relationships with workforce training partners and plans to meet
training and hiring objectives of the program, particularly how they relate to
achieving the program's diversity goals and providing employment opportunities
for former employees of the coal-fueled electric generating facility;
iii) Describe
previous efforts the applicant took to negotiate project labor agreements for
the construction of projects overseen by the applicant, including efforts to
meet diversity targets, improve diversity at job sites, create diverse apprenticeship
opportunities, and create opportunities to employ former coal-fired power plant
workers; and
iv) Describe
how it will meet the requirement of paying at least the prevailing wage,
pursuant to the Prevailing Wage Act [820 ILCS 130], to the applicant's
employees and contractor's employees engaged in construction of the energy
storage facilities;
D) Certification
of eligibility, which shall be in the form of a signed letter by the applicant
on company letterhead which certifies that the applicant and its proposed
project meet the criteria listed in Section 710.40(b) and (c). All
certifications made by the applicant must also be certified by the electric
generating unit owner if they are not the same entity. If a grant applicant is
not the owner of the electric generating unit, the applicant shall submit to
the Department proof of corporate structure showing the applicant's
relationship to the owner of the facility; and
6) Any
additional documentation to demonstrate or support the information submitted by
the applicant for the proposed project.
c) Applicants
may apply for a grant for more than one project but must submit a separate
application for each proposed energy storage facility location.