14 Ill. Adm. Code 710.60
Grant Award Selection
Section 710.60 Grant Award Selection
Grants will be awarded by the Department to grantees
following a merit review by DCEO and pursuant to GATA requirements (44 Ill.
Adm. Code 7000.350). The Department will award up to five total grants that
support the installation and operation of energy storage facilities at the
sites of up to three qualifying electric generating facilities located in the
Midcontinent Independent System Operator, Inc. region in Illinois and the sites
of up to two qualifying electric generating facilities located in the PJM
Interconnection, LLC region in Illinois. In evaluating applications, the
Department will consider the criteria listed below:
a) Whether
the applicant and the proposed energy storage facility site meet the
eligibility criteria (Section 710.40);
b) The
need to develop an energy storage facility at the proposed site. This will be
based on:
1) A
demonstration of how the applicant will engage effectively with the local
community during and after construction;
2) A
justification for the specific project location of the energy storage project
beyond meeting the qualifications established by the Act (e.g., located at a
site with generating capacity of at least 150 megawatts; sites burned or is
burning coal as its primary source of fuel);
3) Providing
documents from Midcontinent Independent System Operator, Inc. or PJM
Interconnection, LLC, indicating proposed project may be interconnected to the
regional transmission grid, as applicable; and
4) A
demonstration of a plan and commitment to ecological site improvement;
c) A
demonstration of the ability to successfully complete the energy storage
facility project. This will be based on the following criteria:
1) Successful
prior experience in the development of energy storage facilities;
2) Significant
energy storage performance based on estimated annual MWh energy storage
capacity and total estimated MWh energy storage capacity over the life of the
energy storage system as follows:
A) Energy
storage capacity, or the maximum amount of stored energy, in MWh;
B) Storage
duration in hours;
C) Expected
system life in years based on anticipated operating conditions;
D) Estimated
energy storage in the first twelve months of system operation; and
E) Estimated
annual system degradation rate, as a percentage;
3) The
ability to provide realistic timelines for construction and the expected date
for commercial operation launch, which comply with the requirements of 20 ILCS
3855/1-75(c-5)(10)(C)(8);
4) Energy
storage capacity of at least 37 megawatts at the proposed energy storage
facility site; and
5) The
ability to meet the requirements of 20 ILCS 3855/1-75(c-5)(10)(C) and this Part,
as demonstrated in the technology description.
d) A
demonstration of the ability to meet the commitments and agreements listed in
20 ILCS 3855/1-75(c-5)(10)(C) and in this Part (Section 710.40). Evaluation
will be based on the following criteria:
1) The
applicant's plan for ensuring the energy storage facility will be constructed
or installed by a qualified entity or entities consistent with the requirements
of subsection (g) of Section 16-128A of the Public Utilities Act [220 ILCS
5/16-128A(g)] and any rules adopted under that Section. Applicants should be
able to demonstrate the effectiveness of the plan;
2) Existing
and proposed relationships with workforce training partners and plans to meet
training and hiring objectives of the program, particularly how they relate to
achieving the program's diversity goals and providing employment opportunities
for employees of the coal-fueled electric generating facility. The applicant
should be able to identify current relationships with workforce training
partners and provide a quality plan to ensure that personnel operating the
energy storage facility will have the skills, knowledge, training and
experience to complete the program, as well as efforts to ensure diverse hiring
and opportunities for employees of coal plants; and
3) Previous
efforts the applicant has had in negotiating project labor agreements for the
construction of projects overseen by the applicant and the details describing
efforts to meet diversity targets, improve diversity at job sites, provide
diverse apprenticeship opportunities, and provide opportunities to employ
former coal-fired power plant workers. The applicant should describe past
experiences negotiating project labor agreements and the effectiveness of past
experience in improving diversity and apprenticeship opportunities.
e) Applicants
may appeal any denial pursuant to the process described in 44 Ill. Adm. Code
7000.350(g).