77 Ill. Adm. Code 250.2460
Finishes
Section 250
Section 250.2460Â Finishes
a)Â Â Â Â Â Â Â Â Cubicle and window curtains and draperies shall be
noncombustible or rendered flame retardant and shall pass both the large and
small scale tests of NFPA 701, Standard Methods of Fire Tests for Flame
Propagation of Textiles and Films.
b)Â Â Â Â Â Â Â Â Flame spread and smoke developed ratings of finishes shall be
in accordance with NFPA 101, Life Safety Code.
c)Â Â Â Â Â Â Â Â Floors in areas and rooms in which flammable anesthetic agents
are stored or administered to patients shall comply with NFPA 99, Standard for
Health Care Facilities. Conductive flooring may be omitted from emergency
treatment, operating, and delivery rooms provided that a written resolution is
signed by the hospital governing board stating that no flammable anesthetic
agents will be used in these areas, and provided that appropriate notices are
permanently and conspicuously affixed to the wall in each such area and room.
d)Â Â Â Â Â Â Â Â Floor materials shall be easily cleanable and have wear
resistance appropriate for the location involved. Floors in areas used for food
preparation or food assembly shall be water resistant and greaseproof. Joints
in tile and similar material in such areas shall be resistant to food acids.Â
Floors in toilets, baths, janitor's closets, and similar areas shall be water
resistant. In all areas frequently subject to wet cleaning methods, floor
materials shall not be physically affected by germicidal and cleaning
solutions.
e)Â Â Â Â Â Â Â Â Wall bases in kitchens, operating and delivery rooms, soiled
work rooms, and other areas that are frequently subject to wet cleaning methods
shall be made integral and coved with the floor, tightly sealed to the wall,
and constructed without surface voids that can harbor vermin.
f)Â Â Â Â Â Â Â Â All wall finishes shall be washable and, in the immediate area
of plumbing fixtures, shall be smooth and moisture resistant. Walls in
surgery, delivery, kitchens and in other spaces subject to frequent cleaning
shall have finishes that are smooth, sanitary, washable, and capable of
withstanding treatment with harsh chemicals. The finishes shall be capable of
being thoroughly cleaned, including concealed spaces.
g)Â Â Â Â Â Â Â Â Floor and wall penetrations by pipes, ducts, and conduits
shall be tightly sealed to minimize entry of vermin, smoke, and fire. Joints
of structural elements shall be similarly sealed.
h)Â Â Â Â Â Â Â Â Ceilings shall be cleanable and shall meet the following
criteria:
1)Â Â Â Â Â Â Â Â Unrestricted general access areas such as patient rooms,
corridors, offices, and waiting areas may have non-restricted acoustical
ceilings installed.
2)Â Â Â Â Â Â Â Â Ceilings in wet areas subject to frequent cleaning such as
shower rooms, toilet rooms, and dietary units shall have finishes that are
smooth, sanitary, washable, and capable of withstanding treatment with harsh
chemicals. The finishes shall be capable of being thoroughly cleaned, including
any concealed spaces that may be present.
3)Â Â Â Â Â Â Â Â Food preparation areas subject to frequent cleaning shall have
ceiling finishes that are smooth, sanitary, washable, and capable of
withstanding treatment with harsh chemicals.
4)Â Â Â Â Â Â Â Â Ceiling finishes in areas such as clean corridors, central
sterile supply spaces, specialized radiographic rooms, and minor surgical
procedure rooms shall be smooth, scrubbable, non-absorptive, non-perforated,
capable of withstanding cleaning with harsh chemicals, and without crevices
that can harbor mold and bacterial growth. If a lay-in ceiling is provided, it
shall be designed to prevent the passage of particles from the cavity above the
ceiling plane into the semi-restricted environment. Perforated, tegular,
serrated, cut, or highly textured tiles are not acceptable.
5)Â Â Â Â Â Â Â Â Ceiling finishes in areas such as operating rooms and other
rooms where open wounds are present shall be monolithic, scrubbable, and
capable of withstanding harsh chemicals. Cracks or perforations in these
ceilings are not allowed.
i)Â Â Â Â Â Â Â Â Â The following areas shall have acoustical ceilings:
1)Â Â Â Â Â Â Â Â Corridors in patient areas;
2)Â Â Â Â Â Â Â Â Nurses' stations;
3)Â Â Â Â Â Â Â Â Labor rooms;
4)Â Â Â Â Â Â Â Â Day rooms;
5)Â Â Â Â Â Â Â Â Recreation rooms;
6)Â Â Â Â Â Â Â Â Dining areas; and
7)Â Â Â Â Â Â Â Â Waiting areas.