77 Ill. Adm. Code 845.265
Lead Work Area Isolation, Preparation and Containment
Section 845.265Â Lead Work Area Isolation, Preparation
and Containment
a)Â Â Â Â Â Â Â Â Work
area isolation, preparation and containment shall be in accordance with the
written Work Practice and Occupant Protection Program required by Section 845.255
and the procedures specified in this Section.
b)Â Â Â Â Â Â Â Â The
licensed lead abatement contractor shall ensure that unauthorized persons are
not permitted to enter a work area where lead mitigation or lead abatement is
occurring.
c)Â Â Â Â Â Â Â Â The
licensed lead abatement contractor shall ensure that all warning signs required
by Section 845.255 are clearly displayed, identifying each work area within the
regulated facility.
d)Â Â Â Â Â Â Â Â At
all times when a lead abatement or lead mitigation project is being conducted
in a regulated facility, the lead abatement contractor shall ensure that the
following conditions are met:
1)Â Â Â Â Â Â Â Â The
Department or its delegate agency shall have access to the work area at any
time during a lead abatement or lead mitigation project to determine compliance
with the requirements of this Part;
2)Â Â Â Â Â Â Â Â The
lead abatement contractor shall ensure that occupants and pets use alternative
entrances and exits that do not require passage through the work area. The
lead abatement contractor shall use all reasonable efforts to create an
uncontaminated passage for entrance and exit of all building occupants;
3)Â Â Â Â Â Â Â Â If the
entrance to and exit from a building can only be through the work area, the
lead abatement contractor shall provide an enclosed passage through the work
area, which serves as an air-tight isolation barrier from the work area and is
to be used for entrance and exit from the building. The airtight enclosed
passage must remain in place until work is complete, final cleanup is conducted,
and the final clearance evaluation required by Section 845.225 has been
successfully completed;
4)Â Â Â Â Â Â Â Â Restricted
access to each work area shall remain in place until work is completed, final cleanup
is conducted, and the final clearance evaluation samples have met the minimum
requirements set forth in Section 845.225.
e)Â Â Â Â Â Â Â Â The
lead abatement contractor shall conduct pre-cleaning of each work area as stated
in the Work Practice and Occupant Protection Plan required by Section 845.255, including
at least the following:
1)Â Â Â Â Â Â Â Â Turn
off all forced air ventilation in the work area and seal exhaust and intake
points in the work area;
2)Â Â Â Â Â Â Â Â Pre-clean
movable objects using HEPA-filtered vacuum equipment or wet cleaning methods,
and remove those objects from the work area;
3)Â Â Â Â Â Â Â Â Clean
upholstered furniture, drapes and removable carpeting twice using HEPA-filtered
vacuum equipment before removal from the work area;
4)Â Â Â Â Â Â Â Â Pre-clean
fixed objects using HEPA-filtered vacuum equipment and/or wet cleaning methods;
and
5)Â Â Â Â Â Â Â Â Pre-clean
the work area using HEPA-filtered vacuum equipment or wet cleaning methods.
f)Â Â Â Â Â Â Â Â Before
beginning lead abatement or lead mitigation in an interior work area, a
licensed lead abatement contractor shall:
1)Â Â Â Â Â Â Â Â Ensure
that access to the work area is restricted as required in subsection (d);
2)Â Â Â Â Â Â Â Â Ensure
that all requirements of work area pre-cleaning specified in subsection (e)
have been completed;
3)Â Â Â Â Â Â Â Â Cover
and seal all objects that cannot be moved, such as radiators, refrigerators,
stoves, kitchen cabinets, built-in furniture, and bookcases, with plastic
sheeting at least 6 mils thick;
4)Â Â Â Â Â Â Â Â Cover
floors in the work area with plastic sheeting at least 6 mils thick and seal in
place. For projects that will last more than one day, 2 layers of plastic
sheeting 6 mils thick shall be installed. At the end of each work day, the top
layer of plastic sheeting shall be cleaned, removed and disposed of in
accordance Section 845.285(b) and replaced; and
5)Â Â Â Â Â Â Â Â Protect
carpeting to ensure that contamination does not occur from the lead abatement
or lead mitigation activities. Carpeting is subject to sampling outlined in
Section 845.225, and the regulatory limits of lead for floors specified in
Section 845.205(c).
g)Â Â Â Â Â Â Â Â Before
beginning lead abatement or lead mitigation in an exterior work area, a
licensed lead abatement contractor shall ensure:
1)Â Â Â Â Â Â Â Â Access
to the work area is  restricted as required in subsection (d) of this Section.
2)Â Â Â Â Â Â Â Â All
requirements of work area pre-cleaning specified in subsection (e) of this
Section have been completed, including removal and disposal of visible paint
chips and debris that are on the ground.
3)Â Â Â Â Â Â Â Â When
waste and debris will be generated from the lead mitigation or lead abatement
activities, a layer of plastic sheeting at least 6 mils thick shall be
installed to collect any debris. The plastic sheeting shall be attached below
the surface that is to be abated or mitigated to collect and contain any waste
and debris. The plastic sheeting shall extend out from the foundation at least
3 feet per story being abated or mitigated, with a minimum of 6 feet and a
maximum of 20 feet. If these horizontal standards cannot be met for any reason,
the lead abatement contractor shall erect vertical containment or equivalent
extra precautions to contain the work area and ensure that dust and debris does
not contaminate adjacent buildings or migrate to adjacent properties.
A)Â Â Â Â Â Â Â When
liquid waste is produced, the lead abatement contractor shall install a waste
collection system capable of handling the amount of liquid waste to be
generated by the procedure.
B)Â Â Â Â Â Â Â The
waste collection system shall be attached below the surface being abated or
mitigated to assure that liquid waste does not leak from the contained work
area.
4)Â Â Â Â Â Â Â Â Containment
systems shall be installed to withstand weather conditions and to contain all
debris and waste generated during the lead abatement or lead mitigation
activities. If inclement weather conditions persist during lead abatement or
lead mitigation activities, the lead abatement contractor shall erect vertical
containment or equivalent extra precautions to contain the work area and ensure
that dust and debris does not contaminate adjacent buildings or migrate to
adjacent properties.
5)Â Â Â Â Â Â Â Â If
the lead abatement contractor is to employ vacuum blasting or contained hydro-blasting,
the interior side of windows shall be sealed with at least 2 layers of plastic sheeting
at least 6 mils thick.
6)Â Â Â Â Â Â Â Â Plastic
containment barriers that cannot be secured to prevent unauthorized access in
the absence of the lead abatement contractor shall be cleaned, removed and
disposed of in accordance with Section 845.285(c) and replaced daily.