77 Ill. Adm. Code 845.280
Abatement and Mitigation of Lead-Contaminated Soil
Section 845.280Â Abatement and Mitigation of
Lead-Contaminated Soil
a)Â Â Â Â Â Â Â Â Soil
abatement, including removal of lead-contaminated soil, shall be conducted in
accordance with methodologies incorporated in Section 845.15 and shall meet the
following requirements:
1)Â Â Â Â Â Â Â Â All
soil removal work shall be conducted by a Department-licensed lead abatement contractor
employing licensed lead abatement workers who are supervised by a licensed lead
abatement supervisor;
2)Â Â Â Â Â Â Â Â Worker
protection shall be provided as required in Section 845.260. At a minimum, all
lead abatement workers removing lead-contaminated soil shall be provided with a
changing area equipped with a facility for washing or showering. Lead
abatement workers shall be required to change into personal protective clothing
before entering the work area, and to remove personal protective clothing and
shower or wash before leaving the work area;
3)Â Â Â Â Â Â Â Â A
Work Practice and Occupant Protection Program as required by Section 845.255 shall
be developed;
4)Â Â Â Â Â Â Â Â Equipment
decontamination procedures shall be employed to prevent the spread of lead dust
and debris. Disposable items are not to be reused and shall be discarded as
provided in Section 845.290. The equipment decontamination procedures shall be
outlined in the Work Practices and Occupant Protection Program required by
Section 845.255;
5)Â Â Â Â Â Â Â Â Prior
to beginning soil removal, the source of the lead contamination shall be
identified and eliminated if possible;
6)Â Â Â Â Â Â Â Â Removal
of the lead-contaminated soil shall be accompanied by dust suppression methods
to keep the generation of dust to a minimum;
7)Â Â Â Â Â Â Â Â Soil
that is stockpiled prior to disposal shall be:
A)Â Â Â Â Â Â Â Placed on a layer of
impermeable plastic;
B)Â Â Â Â Â Â Â Kept moist to avoid dust
generation; and
C)Â Â Â Â Â Â Â Covered with impermeable
plastic that is secured to the ground;
8)Â Â Â Â Â Â Â Â Removed
lead-contaminated soil shall be transported to disposal areas in sealed
containers or in a covered vehicle in accordance with disposal requirements incorporated
in Section 845.290. Off-site vehicular or foot tracking of contaminated soil
shall be avoided;
9)Â Â Â Â Â Â Â Â Any replacement
soil shall be tested and confirmed to have a lead concentration less than 400
ppm. The testing shall be conducted by a licensed lead inspector or lead risk
assessor, with analysis performed by a laboratory currently recognized by NLLAP.
b)Â Â Â Â Â Â Â Â Soil
abatement, including the installation of a permanent cover, such as concrete or
asphalt, over lead-contaminated soil shall be conducted in accordance with
methodologies incorporated in Section 845.15 and shall meet the following requirements:
1)Â Â Â Â Â Â Â Â Soil
abatement work, including the installation of a permanent cover, may be
conducted by non-licensed persons, provided that the abatement activities do
not involve removal of the existing lead-contaminated soil;
2)Â Â Â Â Â Â Â Â Dust
suppression methods shall be employed;
3)Â Â Â Â Â Â Â Â Equipment
decontamination procedures shall be employed to prevent the spread of lead dust
and debris. Disposable items are not to be reused and shall be discarded as
provided in Section 845.290;
4)Â Â Â Â Â Â Â Â Prior
to beginning soil covering, the source of the lead contamination shall be
identified and eliminated, if possible.
c)Â Â Â Â Â Â Â Â Soil
mitigation, including the installation of a non-permanent cover, such as mulch,
stone, gravel, soil, sod, etc., over lead-contaminated soil shall be conducted
in accordance with documented methodologies incorporated in Section 845.15 and
shall meet the following requirements:
1)Â Â Â Â Â Â Â Â Soil
mitigation work, including the installation of a non-permanent cover, may be
conducted by non-licensed persons, provided that the mitigation activities do
not include the removal of the existing lead-contaminated soil;
2)Â Â Â Â Â Â Â Â Dust
suppression methods shall be employed;
3)Â Â Â Â Â Â Â Â Equipment
decontamination procedures shall be employed to prevent the spread of lead dust
and debris. Disposable items are not to be reused and shall be discarded as
provided in Section 845.290;
4)Â Â Â Â Â Â Â Â Prior
to beginning soil mitigation, the source of the lead contamination shall be
identified and eliminated if possible;
5)Â Â Â Â Â Â Â Â The
non-permanent cover material shall be tested and confirmed to have a lead
concentration less than 400 ppm. The testing shall be conducted by a licensed
lead inspector or lead risk assessor, with analysis conducted by a laboratory
currently recognized by NLLAP; and
6)Â Â Â Â Â Â Â Â Installation
of non-permanent covering shall be applied to a minimum depth of 2 inches over
the lead-contaminated soil.