77 Ill. Adm. Code 845.285
Cleanup Procedures
Section 845.285Â Cleanup Procedures
a)Â Â Â Â Â Â Â Â Cleanup
of interior and exterior work areas shall be conducted at least daily at the
end of the work shift, and upon completion of the lead mitigation and lead
abatement work.
b)Â Â Â Â Â Â Â Â The
lead abatement contractor shall clean up interior work areas using the
following procedures in the order that they appear:
1)Â Â Â Â Â Â Â Â All
work area isolation systems required in Section 845.265 shall remain in place
until completion of the final clearance evaluation in accordance with Section 845.225.
2)Â Â Â Â Â Â Â Â All
waste and debris shall be removed from the work area and disposed of in
accordance with Section 845.290.
3)Â Â Â Â Â Â Â Â All
surfaces and plastic containment barriers in the work area shall be HEPA
vacuumed and wet washed with a detergent and water solution.
4)Â Â Â Â Â Â Â Â After
wet washing and allowing all surfaces to dry, HEPA vacuuming of all surfaces in
the work area shall be repeated.
5)Â Â Â Â Â Â Â Â All
plastic barriers used for containment, excluding isolation barriers, if
present, shall be removed, disposed of and replaced daily until final clean up.
6)Â Â Â Â Â Â Â Â All
lead waste, isolation barriers and material from clean up, including mop heads,
sponges, filters and disposable clothing, shall be deposited and sealed
airtight in double plastic bags at least 4 mils thick or single bags 6 mils
thick.
c)Â Â Â Â Â Â Â Â The
lead abatement contractor shall clean up exterior work areas using the
following procedures:
1)Â Â Â Â Â Â Â Â All
waste and debris shall be removed from the work area and disposed of in
accordance with Section 845.290.
2)Â Â Â Â Â Â Â Â All
plastic barriers used for containment shall be removed, disposed of and
replaced daily until final clean up. The plastic sheeting shall be removed in a
manner to prevent release of any remaining debris.
A)Â Â Â Â Â Â Â Any
surface with visible debris remaining after removal of plastic sheeting shall
be HEPA vacuumed.
B)Â Â Â Â Â Â Â All
exterior horizontal components in the work area shall be wet washed with a
detergent and water solution.
3)Â Â Â Â Â Â Â Â All
lead waste, work area barriers and material from clean up, including mop heads,
sponges, filters and disposable clothing, shall be deposited and sealed
airtight in double plastic bags at least 4 mils thick or single bags 6 mils
thick, and the bags shall be sealed.