77 Ill. Adm. Code 855.410
Worker Decontamination Enclosure System
Section 855
Section 855.410Â Worker
Decontamination Enclosure System
The contractor shall construct
or provide a worker decontamination enclosure system in accordance with the
following:
a)Â Â Â Â Â Â Â Â Worker decontamination enclosure systems shall be provided at
all locations where workers will enter or exit the work area. These systems
may consist of existing rooms outside of the work area, if the layout is
appropriate, that can be enclosed in plastic sheeting and are accessible from
the work area. When this situation does not exist, enclosure systems may be
constructed out of metal, wood or plastic support as appropriate, or a portable
unit may be utilized (see Appendix A, Illustration D).
b)Â Â Â Â Â Â Â Â Worker decontamination enclosure systems constructed at the
worksite of plastic sheeting installed over a framework shall utilize six mil opaque
polyethylene or equivalent strength sheeting.
c)Â Â Â Â Â Â Â Â The worker decontamination enclosure system shall consist of
at least a clean room, a shower room, and an equipment room, separated from
each other by airlocks.
d)Â Â Â Â Â Â Â Â Entry to and exit from all airlocks and decontamination
enclosure system chambers shall be through curtained doorways.
e)Â Â Â Â Â Â Â Â Access between any two rooms in the decontamination enclosure
system shall be through an airlock with at least three feet separating each
curtained doorway. Pathways into (from clean to contaminated) and out from
(contaminated to clean) the work area shall be clearly designated.
f)Â Â Â Â Â Â Â Â The clean room shall be sized to accommodate the clothes and
equipment of the work crew. Benches shall be provided, as well as hooks for
hanging up street clothes. Lockers may be provided for valuables; however,
workers may be requested to secure valuables elsewhere. Shelves for storing
respirators shall also be provided in this area. Clean work clothes (if
required under disposables), clean disposable clothing, replacement filters for
respirators, towels and other necessary items shall be provided in the clean
room. A location for postings shall also be provided in this area. A lockable
door shall be used to permit access into the clean room from outside the work
area. This space shall not be used for storage of tools, equipment, or
materials, or as office space.
g)Â Â Â Â Â Â Â Â The shower room shall contain one or more showers to
accommodate workers. Each shower head shall be supplied with hot and cold water
adjustable at the tap. The shower enclosure shall be constructed to ensure
against leakage of any kind. Soap, shampoo and towels shall be supplied by the
contractor and shall be available at all times. Shower water shall be drained,
collected and filtered through a system with at least 5.0 micron particle size
collection capability. A system containing a series of several filters with
progressively smaller pore sizes shall be used to avoid rapid clogging of the
filtration system by large particles. Filtered wastewater shall be discharged
to a sanitary sewer.
h)Â Â Â Â Â Â Â Â The equipment room shall be used for storage of equipment and
tools at the end of a shift after decontamination using a HEPA filtered vacuum
and/or wet cleaning techniques. Replacement filters (in sealed containers
until used) for HEPA vacuums and negative pressure ventilation equipment, extra
tools, containers of surfactant and other materials and equipment that may be
required during the abatement may also be stored here as needed. A labeled six
mil polyethylene or equivalent bag for collection of disposable clothing shall
be located in this room. Contaminated footwear (e.g., rubber boots and other
reusable footwear) shall be stored in this area for reuse.