77 Ill. Adm. Code 855.465
Cleanup Procedures
Section 855
Section 855.465Â Cleanup
Procedures
The contractor shall perform the
cleanup in accordance with the following procedures:
a)Â Â Â Â Â Â Â Â The negative pressure ventilation units shall remain in
continuous operation.
b)Â Â Â Â Â Â Â Â Decontamination enclosure systems shall remain in place,
remain functional at all times, and be utilized.
c)Â Â Â Â Â Â Â Â All visible accumulations of ACBM and asbestos-contaminated debris
shall be removed and containerized. Tools which are not electrically
conducting and which have no sharp edges or corners likely to tear containment
barriers (e.g., rubber dust pans, rubber squeegees, or plastic shovels) shall
be utilized.
d)Â Â Â Â Â Â Â Â All containerized waste shall be removed from the work area
and the holding area on a daily basis. The contractor may temporarily store
ACBM in large metal, locked dumpsters or an enclosed truck at the abatement
site. At the conclusion of the abatement project, all temporarily stored ACBM
shall be removed from the abatement site and be transported to a regulated
landfill location approved for disposal of asbestos-containing waste.
e)Â Â Â Â Â Â Â Â The contained area shall be thoroughly cleaned in accordance
with the following procedures:
1)Â Â Â Â Â Â Â Â First cleaning:Â all surfaces in the contained area shall be
wet cleaned using rags, mops and sponges. To pick up excess water and gross
wet debris, a wet-dry shop vacuum or HEPA vacuum may be used. If a vacuum is
used, it shall be decontaminated prior to removal from the contained area. The
contractor shall then wait a minimum of 12 hours before proceeding with
clean-up.
2)Â Â Â Â Â Â Â Â At the conclusion of the 12 hour waiting period, if no water
is visible on surfaces, the cleaned first layer of plastic sheeting shall be
removed from the walls and floors. The sheeting shall be folded inward and
bagged for disposal.
3)Â Â Â Â Â Â Â Â Second cleaning:Â the second layer of plastic sheeting and all
objects and surfaces in the contained area shall be HEPA vacuumed and/or wet
cleaned. The contractor shall then wait a minimum of 12 hours before
proceeding to the next step.
4)Â Â Â Â Â Â Â Â If no visible moisture remains on surfaces in the contained
area at the conclusion of the 12 hour period, the cleaned second layer of plastic
sheeting shall be removed from the walls and floors. The sheeting shall be
folded inward and bagged for disposal.
5)Â Â Â Â Â Â Â Â Third cleaning:Â windows, doors, HVAC system vents and all
other openings shall remain sealed. All objects and surfaces in the work area
shall be HEPA vacuumed and wet cleaned. The contractor shall wait a minimum of
12 hours drying time before proceeding.
6)Â Â Â Â Â Â Â Â If all surfaces in the contained area are dry at the end of
the 12 hour period, the contractor shall inspect the contained area for visible
residue. If any accumulation of residue is observed, the residue will be
assumed to be asbestos and the process described in step 5 shall be repeated.