77 Ill. Adm. Code 855.475
Disposal Procedures
Section 855
Section 855.475Â Disposal
Procedures
a)Â Â Â Â Â Â Â Â Sealed and labeled containers of asbestos-containing waste
material shall be removed and transported to a prearranged disposal location.
b)Â Â Â Â Â Â Â Â All dump receipts, trip tickets, transportation manifests
and/or other documentation of disposal shall be delivered to the building owner
for his records. A recordkeeping format utilizing a chain-of-custody form
shall include the names and addresses of the building owner, contractor, pickup
site, disposal site, the estimated quantity of the asbestos waste and the type
and number of containers used. The form shall be signed by the building owner,
the contractor, and the disposal site operator, as the material changes
custody. If a separate hauler is employed, his name, address, telephone number
and signature shall also appear on the form.
c)Â Â Â Â Â Â Â Â The contractor shall transport asbestos materials in
accordance with the following procedures:
1)Â Â Â Â Â Â Â Â Drums, bags and wrapped components that have been removed from
the work area shall be loaded into an enclosed truck for transportation. Cargo
areas shall be locked when unattended.
2)Â Â Â Â Â Â Â Â The enclosed cargo area of the truck shall be free of debris
and lined with six mil polyethylene or equivalent sheeting to prevent
contamination from leaking or spilled containers. Floor sheeting shall be
installed first and extend up the side walls. Wall sheeting shall overlap by
six inches and be taped into place.
3)Â Â Â Â Â Â Â Â Drums shall be placed on level surfaces in the cargo area and
packed tightly together to prevent shifting and tipping. Large structural
components shall not be placed on top of bags of asbestos-containing materials
and shall be secured to prevent shifting. Containers shall not be thrown into
the truck cargo area.
4)Â Â Â Â Â Â Â Â Personnel loading asbestos-containing waste shall be licensed
workers and shall be protected by disposable clothing, including head, body and
foot protection and, at a minimum, half-facepiece, air-purifying, dual
cartridge respirators equipped with high efficiency HEPA filters.
5)Â Â Â Â Â Â Â Â Any debris or residue observed on containers or surfaces
outside of the work area resulting from cleanup or disposal activities shall be
immediately cleaned up using HEPA filtered vacuum equipment and/or wet methods.
6)Â Â Â Â Â Â Â Â Dumpsters or enclosed cargo areas of trucks used for asbestos
waste storage or disposal shall be constructed of metal and have metal doors
and metal tops that can be closed and locked to prevent vandalism, wind
dispersion of asbestos fibers, or other disturbance of bagged asbestos debris.Â
Unbagged material and nonasbestos waste shall not be placed in these
containers. Bags shall be placed, not thrown, into these containers to avoid
splitting.
7)Â Â Â Â Â Â Â Â Asbestos-containing waste materials shall be transported
directly to the landfill. Temporary storage at a location other than the
abatement project shall not be permitted.
d)Â Â Â Â Â Â Â Â The contractor shall dispose of asbestos materials in
accordance with the following procedures:
1)Â Â Â Â Â Â Â Â Upon reaching the landfill, trucks shall approach the dump
location as closely as possible for unloading of the asbestos-containing waste.
2)Â Â Â Â Â Â Â Â Bags, drums and components shall be inspected when off-loaded
at the disposal site. Material in damaged containers shall be repacked in
empty drums or bags.
3)Â Â Â Â Â Â Â Â Waste containers shall be placed on the ground at the disposal
site, not pushed or thrown out of trucks (the weight of the wet material could
rupture containers).
4)Â Â Â Â Â Â Â Â Personnel off-loading containers at the disposal site shall
wear protective equipment consisting of disposable head, body and foot
protection and, at a minimum, half-facepiece, air-purifying, dual cartridge
respirators equipped with high efficiency HEPA filters.
5)Â Â Â Â Â Â Â Â Following the removal of all containerized waste, the truck
cargo area shall be decontaminated using HEPA vacuums and/or wet methods.Â
Polyethylene sheeting shall be removed and discarded in bags or drums along
with contaminated cleaning materials and protective clothing daily.