77 Ill. Adm. Code 855.500
Encapsulation Procedures for Schools
Section 855
Section 855.500Â
Encapsulation Procedures for Schools
The contractor shall encapsulate
the ACBM in accordance with the following procedures:
a)Â Â Â Â Â Â Â Â The work area shall be cleaned and isolated in accordance with
Sections 855.400, 855.410, 855.420, 855.425, 855.430, 855.440 and 855.450.
b)Â Â Â Â Â Â Â Â Damaged and missing areas of existing materials shall be
repaired with nonasbestos-containing substitutes. The material shall adhere to
existing surfaces and provide a base for application of encapsulating agents.
c)Â Â Â Â Â Â Â Â Loose or hanging ACBM shall be removed in accordance with the
requirements of Section 855.460.
d)Â Â Â Â Â Â Â Â The contractor shall field test encapsulants prior to use by
applying each to a small area to determine suitability for the material to be
encapsulated.
e)Â Â Â Â Â Â Â Â Bridging Encapsulants
1)Â Â Â Â Â Â Â Â Bridging encapsulants shall be applied to provide the
manufacturer's specified number of inches or minimum dry film thickness over
sprayed asbestos surfaces.
2)Â Â Â Â Â Â Â Â When using a bridging encapsulant, a different color for each
coat shall be used.
f)Â Â Â Â Â Â Â Â Penetrating Encapsulants
1)Â Â Â Â Â Â Â Â Penetrating encapsulants shall be applied to penetrate
existing asbestos materials to the substrate.
2)Â Â Â Â Â Â Â Â During treatment with a penetrating encapsulant, the
contractor shall remove selected random core samples of the ACBM in the
presence of the building owner or the project manager to check the depth of
penetration.
g)Â Â Â Â Â Â Â Â Encapsulants shall be applied using airless spray equipment.
h)Â Â Â Â Â Â Â Â Cleanup shall be performed in accordance with Section 855.465.
i)Â Â Â Â Â Â Â Â Â Encapsulated ACBM shall be designated (e.g., labels, signs or
color codes) in order to warn building maintenance personnel in the event that
encapsulated materials must be disturbed.