77 Ill. Adm. Code 855.510
Enclosure Procedures for Schools
Section 855
Section 855.510Â Enclosure
Procedures for Schools
The contractor shall enclose
ACBM in accordance with the following procedures:
a)Â Â Â Â Â Â Â Â The work area shall be cleaned and isolated in accordance with
Sections 855.400, 855.410, 855.420, 855.425, 855.430, 855.440 and 855.450.
b)Â Â Â Â Â Â Â Â Areas that may be disturbed during the installation of hangers
or other support/framing materials for the enclosure shall be sprayed with
amended water. These areas shall be kept damp to reduce airborne fiber
concentrations.
c)Â Â Â Â Â Â Â Â Loose and hanging ACBM shall be removed in accordance with the
requirements of Section 855.460.
d)Â Â Â Â Â Â Â Â After installation of hangers, brackets or other enclosure
supports and before installation of enclosure, damaged areas of
fireproofing/thermal insulation materials shall be repaired using a
nonasbestos-containing replacement material. Surfaces shall be prepared and
replacement material applied in accordance with manufacturer's recommendations.
e)Â Â Â Â Â Â Â Â Hand tools used to drill, cut into, or otherwise disturb ACBM
during the installation of support systems for the enclosures shall be equipped
with HEPA filtered local exhaust ventilation.
f)Â Â Â Â Â Â Â Â Enclosure materials shall be impact resistant and provide an
airtight barrier once construction is complete (see Section 855.390(i)).
g)Â Â Â Â Â Â Â Â Utilities shall be lowered as necessary and reinstalled in a
manner which permits proper utilization and does not disturb the integrity of
the enclosures. Utility maintenance shall not require the enclosures to be
opened or disturbed.
h)Â Â Â Â Â Â Â Â Cleanup shall be in accordance with Section 855.465.
i)Â Â Â Â Â Â Â Â Â Enclosed ACBM shall be designated (e.g., sign, label or color
code) in order to warn building maintenance personnel in the event that the
enclosure must be disturbed.