77 Ill. Adm. Code 905.55
Subsurface Seepage System Design Requirements
Section 905
Section 905.55Â Subsurface
Seepage System Design Requirements
After January 1, 2014, when
designing a subsurface seepage system, the absorption capacity of the soil
shall be determined by subsection (a). After January 1, 2014, subsection (b)
shall not be used to determine design requirements for a subsurface system.
a)Â Â Â Â Â Â Â Â Soil Investigation
1)Â Â Â Â Â Â Â Â Soil investigations shall be conducted in the following
manner:
A)Â Â Â Â Â Â Â Determination of soil characteristics on sites proposed for
development with private sewage disposal systems shall be based on soil boring
data collected by a soil classifier or an Illinois licensed Professional
Engineer.
B)Â Â Â Â Â Â Â There shall be a minimum of 3 borings per soil absorption
system site. The soil borings shall be at least 50 feet apart, and the
proposed subsurface seepage system shall be located within the area where the
soil borings were located. More soil borings may be necessary for accurate and
appropriate evaluation of a site where there is some concern about the
consistency of the soil materials. One of the borings shall be made at the
lowest elevation of the proposed absorption field area. Borings shall extend a
minimum of 60 inches below the natural ground surface. An observation pit
shall be used in gravelly materials.
C)Â Â Â Â Â Â Â Observation and determination of soil characteristics may also be
determined from a pit dug by a backhoe or other excavating equipment. The
Department or local authority may require soil pits (backhoe excavation) in
cases where ground is frozen, where the soil materials are considerably varied
in texture, where there has been previous or current fill material or cutting
of soils, or where gravelly soils are encountered. Soil pits shall be prepared
at the perimeter of the expected soil absorption area to minimize damage to
natural soil structure. Soil pits shall extend a minimum of 60 inches below
the natural ground surface.
D)Â Â Â Â Â Â Â Site characteristics to be described include zones of seasonal
and permanent water saturation, United States Department of Agriculture (USDA)
soil textural changes; USDA soil structural features for each horizon, slope,
compaction and depth; soil coloration; consistence; coatings; depth of limiting
layer; depth of soil mottling; internal drainage classification; permeability
range; and other limiting soil characteristics that may reduce permeability. The
following reference materials shall be used as a guide for describing and
classifying soil: Field Book for Describing and Sampling Soils, Soil Taxonomy,
and Soil Survey Manual.
2)Â Â Â Â Â Â Â Â The following persons are qualified to conduct soil
investigations:
A)Â Â Â Â Â Â Â any person who meets the definition of soil classifier in
Section 905.10;
B)Â Â Â Â Â Â Â an Illinois licensed Professional Engineer;
C)Â Â Â Â Â Â Â an employee of a local health department who has 3 years of
experience in designing or approving private sewage disposal systems using soil
classification information and 6 semester hours of soils-related coursework;
D)Â Â Â Â Â Â Â an employee of a local health department with 5 years of experience
reviewing the design and approving private sewage disposal systems using soil
classification information under the direct supervision of those persons listed
in subsection (a)(2)(A), (B) or (C).
3)Â Â Â Â Â Â Â Â If conflicting soils investigation information is provided
about a given site, a third Soil Classifier may be requested to provide additional
information or help to resolve the conflict. A National Resources Conservation
Service (NRCS) Soil Scientist who is also a Soil Classifier may be contacted
for technical information or interpretation.
b)Â Â Â Â Â Â Â Â Percolation Tests
1)        Performance of Percolation Tests. At least 3 separate
percolation tests, a minimum of 50 feet apart, shall be performed at the site
of each proposed subsurface seepage system.
2)        Procedure for Performing Percolation Tests. Percolation tests
shall be performed in accordance with the procedure outlined in Appendix A,
Illustration G. Alternate procedures for performing percolation tests may be
submitted to the Department for review. If determined to be as stringent as
that described in Appendix A, Illustration G, the alternate procedure will be
approved.
3)Â Â Â Â Â Â Â Â The Department or its agent may choose not to accept
percolation data results and may require a soil investigation if soils
information, permits for private sewage disposal systems in proximity to the
proposed site, direct observation or other information shows conditions that
will have an impact on the design, construction, installation, modification or
performance of the private sewage disposal system.