77 Ill. Adm. Code 905.60
Subsurface Seepage System Construction Requirements
Section 905
Section 905.60Â Subsurface
Seepage System Construction Requirements
a)        Seepage Field Requirements – Gravel, Gravelless and Chamber Systems.Â
Subsurface seepage fields shall be designed and constructed in accordance with
Appendix A, Illustrations H, I and J and the following:
1)Â Â Â Â Â Â Â Â All subsurface seepage systems using soils information for
sizing shall use the soil suitability table in Appendix A, Illustration M to
determine the size requirements of the subsurface seepage system. The least
permeable soil layer between the top of the gravel or gravelless pipe or
chamber system and 2 feet below the bottom of the trench shall be used to
determine the size of the subsurface seepage system. For mound or at-grade
systems, the least permeable soil layer in the upper 2 feet of the soil shall
be used to determine system size.
2)Â Â Â Â Â Â Â Â The bottom of the subsurface seepage field, each trench and
its distribution line shall be level. Level for this Part shall mean plus or
minus ½ inch in any direction over the entire area of the subsurface seepage
system.
3)Â Â Â Â Â Â Â Â There shall be a minimum of 6 inches and a maximum of 24
inches of earth backfill over the bedding materials, gravelless pipe or chamber
system.
4)Â Â Â Â Â Â Â Â There shall be a minimum of 5 feet of undisturbed earth
between the septic tank and the nearest trench.
5)Â Â Â Â Â Â Â Â If precipitation falls onto the excavation and evidence of
soil washing into the excavation of the subsurface seepage system exists, the
damaged portion of the seepage system shall be reconstructed to comply with
this Section.
6)Â Â Â Â Â Â Â Â The top of the gravel, gravelless pipe, or chamber system in
the subsurface seepage field shall be at least one inch below the invert of the
outlet pipe from the septic tank or distribution box in a gravity flow system.
7)        Site Evaluation for Subsurface Seepage Systems. Subsurface
seepage systems receiving septic tank effluent shall have at least 2 feet of
vertical separation distance between the bottom of the subsurface seepage
system and the top of the limiting layer. For soils in Design Group I-VI or
with a loading rate of greater than 0.62 gallons per day per square foot, there
shall be at least a vertical separation distance of 3 feet between the bottom
of the subsurface seepage system and the top of the limiting layer. When the
limiting layer is the estimated seasonal high water table, artificial drains,
which are designed to lower the estimated seasonal high water table, may be
installed to achieve the specified vertical separation distances.
8)Â Â Â Â Â Â Â Â Sizing of a Seepage System in Fill Soil
A)Â Â Â Â Â Â Â The least permeable soil layer between the top of the gravel,
gravelless pipe or chamber system and 2 feet below the bottom of the trench
shall be used to determine the size of the subsurface seepage system.
B)Â Â Â Â Â Â Â The use of fill for installing subsurface seepage systems shall
not be approved for lots platted after March 15, 1996.
C)Â Â Â Â Â Â Â Fill soils may be used to cover a private sewage disposal
system, provided that no part of the system is located in the fill and the fill
material is at least equal to or better than the original soil or meets the
requirements in subsection (a)(9).
9)Â Â Â Â Â Â Â Â Soil Criteria for Use of Fill in Subsurface Seepage Systems
A)Â Â Â Â Â Â Â Soils to be used for fill shall be identified by a soil
classifier or licensed Professional Engineer and a report submitted to the
Department or local authority. The report shall contain specific information
on the fill soil, including location, depth, permeability, and texture. Soils
that can be used as fill are those identified in Appendix A, Illustration M as
2A, 2B, 2K, 3A, 3B, 3C, 3K, 3L, 4B, 4D and 4K (Design Group II, III and IV).
B)Â Â Â Â Â Â Â In addition to the requirements in subsection (a)(9)(A), fill
soil shall not contain extraneous material such as tires, concrete, brick,
reinforcing bar, demolition material, etc.
C)Â Â Â Â Â Â Â All of the following conditions shall be met for a subsurface
seepage system to be installed in fill.
i)Â Â Â Â Â Â Â Â Â Satisfactory original soil shall be at least 3 feet above
bedrock.
ii)Â Â Â Â Â Â Â Â A maximum of 2 feet of fill soil shall be used.
iii)Â Â Â Â Â Â Â Fill shall not be placed on original soil with a slope
greater than 10%.
iv)Â Â Â Â Â Â Â The fill shall be placed at the site so that a minimum of compaction
occurs, and the fill shall be allowed to settle undisturbed for a period of at
least 12 months. Soils in Design Group II, when used for fill, shall not be
required to settle for a period of at least 12 months.
v)Â Â Â Â Â Â Â Â After the fill has been settled, a percolation test shall be
conducted in accordance with the procedure outlined in Appendix A, Illustration
G and a percolation rate of not greater than 270 minutes/6 inch fall or less
than 60 minutes/6 inch fall shall be achieved.
10)Â Â Â Â Â Â Â Â Site Preparation for Use of Fill Soil
A)       Excess vegetation shall be cut and removed. The site shall be
plowed with a mold board plow 7 to 8 inches deep with the plowing done
perpendicular to the slope. It shall not be done with the furrow running up
and down the slope. Chisel plowing may be used in place of mold board.Â
Roto-tilling is prohibited.
B)Â Â Â Â Â Â Â Once the site is plowed, all traffic shall be kept off the
site. The fill material can be deposited on the top with a backhoe or pushed
on from the side, preferably the upslope side, using a track type tractor,
keeping 6 inches of fill beneath the tracks. At no time shall ruts be made in
the plowed area. The fill shall be placed immediately after site preparation
to avoid the possibility of precipitation falling on the plowed area.
C)Â Â Â Â Â Â Â Traffic on the downslope side of the fill area shall be minimal
to reduce compaction. All work shall be performed from the ends and upslope
side. Compaction of the natural soil downslope will reduce the lateral movement
of the effluent.
D)Â Â Â Â Â Â Â The fill shall not be placed on frozen ground or when the soil
is wet. Moisture content of the soil is very important when filling. Site
preparation shall not take place when the soil is too wet. To check moisture
content, a soil sample may be taken from the plow layer (7 to 8 inches) and rolled
between the palms of the hands. If the soil rolls into a ribbon, it is too wet
to prepare. If the soil crumbles, site preparation can then proceed.
b)Â Â Â Â Â Â Â Â Gravel
Seepage Field Requirements
1)        Bedding Material. The bedding material shall be clean gravel
or clean stone that is free of mud, silt, or clay, with particle size ranging
from ¾ inch minimum to 4 inches maximum. The bedding material shall extend the
full width of the trench and to a depth of at least 6 inches below the bottom
of the distribution line. The bedding material shall extend at least 2 inches
above the top of the distribution line.
2)        Distribution Lines. Distribution lines shall be constructed
of materials as approved in Section 905.20(f). The lines shall be perforated
or open-joint tile. Where open joint tile is used, the tile sections shall be
spaced not less than ¼ inch or more than ½ inch apart. Perforated piping with
the exception of 8-inch or 10-inch gravelless seepage beds shall have ½- to ¾-
inch diameter openings on 3- to 5-inch centers with a minimum of 2 rows. The
openings in the pipe shall be placed downward.
3)        Separation Material. Bedding materials shall be covered by
straw, newspaper, untreated building paper, geotextile fabric or other
permeable or biodegradable material to support the backfill as the laying of
the distribution line proceeds. Tar paper, plastic, or other impervious
material shall not be used between the bedding material and the earth backfill.
4)Â Â Â Â Â Â Â Â The ends of a gravel seepage field shall be looped except in
serial distribution systems.
c)        Gravelless Seepage Field Requirements. In addition to Section
905.20(f), 8-inch or 10-inch gravelless seepage systems shall comply with the
following specifications:
1)Â Â Â Â Â Â Â Â 8-inch and 10-inch inside diameter (I.D.) corrugated
polyethylene tubing shall meet the requirements of ASTM F667-06, Standard
Specification for Large Diameter Corrugated Polyethylene Tubing with the
following exceptions:
A)Â Â Â Â Â Â Â Perforations shall be uniformly spaced along the length of the
tubing as follows: 2 rows of holes ⅜ inch in diameter for 8-inch tubing
and ½ inch in diameter for 10-inch tubing, located 120° to 140° apart along the
bottom half of the tubing, each row 60° to 70° up from the bottom center line.Â
The perforations shall be staggered so that there is at least one hole in each
corrugation.
B)Â Â Â Â Â Â Â The pipe shall be marked to indicate the top of the pipe.
2)Â Â Â Â Â Â Â Â All gravelless drainfield pipe shall be encased at the point
of manufacture with a filter wrap having the following characteristics:
Physical Properties
Minimum
Value
Grab Strength, lbs. (ASTM
D4632)
Machine
Direction
19
Traverse
Direction
11
Burst strength, psi (ASTM
D3786-09)
26
Air Permeability, cfm per sq. ft. (ASTM D737-08)
500
Particle Size Distribution
(ASTM F662-86) Polyethylene particles in water and alcohol
solution, coulter counter analysis, single pass:
Particle
Size (Microns)
%
Retained
70
80
60
68
50
56
40
40
30
22
20
5
3)Â Â Â Â Â Â Â Â 8-inch or 10-inch gravelless seepage trenches shall comply
with the following Illustrations in Appendix A unless otherwise stated in this
Part:
A)Â Â Â Â Â Â Â Illustration D
B)Â Â Â Â Â Â Â Illustration H, Exhibit
B
C)Â Â Â Â Â Â Â Illustration I, Exhibit
C
D)Â Â Â Â Â Â Â Illustration I, Exhibit
D
E)Â Â Â Â Â Â Â Illustration J, Exhibit
C
F)Â Â Â Â Â Â Â Â Illustration J, Exhibit
D
G)Â Â Â Â Â Â Â Illustration K, Exhibits
E through H
H)Â Â Â Â Â Â Â Illustration M, Exhibit
A
4)        Bedding Material. 8-inch and 10-inch gravelless seepage
systems or chamber systems may be bedded with material excavated to construct
the system. The backfill material shall not contain large clods of earth,
demolition material or other extraneous material.
5)Â Â Â Â Â Â Â Â Separation Material. No straw, newspaper or untreated building
paper shall be placed between the gravelless seepage system or chamber system and
the earth backfill.
6)        Bending. 8-inch and 10-inch gravelless pipe shall not be bent
around corners on a radius of less than 5 feet. If a sharper radius is
required, a tee shall be used.
7)Â Â Â Â Â Â Â Â Gravelless seepage systems or chamber systems are not required
to be looped. Gravelless seepage systems or chamber systems that are not
looped shall be capped on the end.
d)        Serial Distribution. Serial distribution shall be used in
areas where the slope of the terrain prohibits the installation of conventional
subsurface seepage systems. The following criteria shall be used in the design
and construction of a serial distribution system (see Appendix A, Illustration
K):
1)Â Â Â Â Â Â Â Â The bottom of each trench and its distribution line shall be
level.
2)Â Â Â Â Â Â Â Â There shall be a minimum of 6 inches of earth backfill over
the bedding material or chamber system or the gravelless pipe in the trenches.
3)Â Â Â Â Â Â Â Â The trench shall follow the ground surface contours so that
variation in trench depth will be minimized.
4)Â Â Â Â Â Â Â Â There shall be a minimum of 5 feet of undisturbed earth
between the septic tank and the nearest trench.
5)Â Â Â Â Â Â Â Â Adjacent trenches shall be connected with a relief line or a
drop box arranged so that each trench is completely filled to the full depth of
the gravel or gravelless pipe or chamber system before effluent flows to the
succeeding trench.
6)Â Â Â Â Â Â Â Â The relief lines connecting the trenches shall have watertight
joints and direct connections to the distribution lines in adjacent trenches.Â
Tight joint T's and 45° ells, or a drop box arrangement shall be used to
connect adjacent trenches.
7)Â Â Â Â Â Â Â Â Where the relief pipe trench connects with the higher trench,
it shall not be deeper than the top of the gravel or gravelless pipe or chamber
system in the higher trench. Relief lines shall rest on undisturbed earth and
the backfill shall be carefully tamped.
8)Â Â Â Â Â Â Â Â The invert of the first relief line shall be at least one inch
lower than the invert of the septic tank or aerobic treatment plant outlet.Â
(See Appendix A, Illustration K.)
9)Â Â Â Â Â Â Â Â All other construction features of the serial distribution
field shall comply with subsections (a) through (d).
e)        Seepage Beds. The total bottom area of the seepage bed shall
be 1½ times the area specified in Appendix A, Illustration H, Exhibit A or
Illustration M, Exhibit A. Construction features shall conform to subsections
(a) and (b). Distribution lines shall be spaced no farther than 6 feet center
to center and shall be equally spaced. Lines adjacent to the bed sidewalls
shall be 18 inches from the bed sidewall. (See Appendix A, Illustration L.)
Seepage beds shall be constructed so that construction equipment does not drive
over the bottom of the bed.
f)        Chamber Systems. Chamber systems shall be sized and installed
in accordance with the following:
1)Â Â Â Â Â Â Â Â Center-to-center spacing for chamber systems shall be in
compliance with Appendix A, Illustration I, Exhibit D.
2)Â Â Â Â Â Â Â Â Chamber systems shall be sized in accordance with Appendix A,
Illustration I, Exhibit E.
3)Â Â Â Â Â Â Â Â Chamber systems shall be designed to support all weight of
earth backfill without collapsing.
4)Â Â Â Â Â Â Â Â Chamber systems shall be designed to prevent earth backfill
from restricting flow within the chamber.
g)Â Â Â Â Â Â Â Â Subsurface
Drip Irrigation Systems. Subsurface drip irrigation systems shall be designed,
installed and maintained in accordance with the following:
1)Â Â Â Â Â Â Â Â The
drip irrigation system shall be designed, installed and operated as a
subsurface seepage system, and no portion of the drip irrigation system shall
have a surface discharge.
A)Â Â Â Â Â Â Â Pre-treatment
i)Â Â Â Â Â Â Â Â Â The
drip irrigation system shall be preceded by a pre-treatment process designed to
reduce the CBOD
5
(carbonaceous 5-day biochemical oxygen demand) to a
maximum concentration of 25 mg/L and total suspended solids to a maximum
concentration of 30 mg/L. Drip irrigation systems shall not be installed
following a septic tank without any pre-treatment process capable of meeting
this Part's requirements.
ii)Â Â Â Â Â Â Â Â The
total flow from the property plus the backwash water from the drip irrigation
system shall not exceed the treatment capacity of the pre-treatment device.
iii)Â Â Â Â Â Â Â The
installation contractor, designer or homeowner, in consultation with the
manufacturer or the manufacturer's representative, shall assure that the
pre-treatment process meets the requirements of this Part.
B)Â Â Â Â Â Â Â Dosing
Tank
i)Â Â Â Â Â Â Â Â Â A
minimum liquid capacity of 1,000 gallons shall be provided below the inlet in
the dosing tank for a residential or non-residential site.
ii)Â Â Â Â Â Â Â Â For
homes larger than three bedrooms and non-residential systems with a daily
design flow greater than 667 gallons/day, a dosing tank with a minimum capacity
of 1.5 days design flow shall be provided.
C)Â Â Â Â Â Â Â Dosing
Pump
i)Â Â Â Â Â Â Â Â Â A high head/low volume
pump shall be used.
ii)Â Â Â Â Â Â Â Â The
pump shall be sized based upon the design flow rate of the drip irrigation
field, which shall be based on the number of emitters times the flow rate of
each emitter in gallons per minute.
iii)Â Â Â Â Â Â Â The
minimum head requirement of the pump shall be based upon the pressure
requirements for the operation and flushing of the drip field plus the total
static and friction head requirements of the supply lines and manifolds.
iv)Â Â Â Â Â Â Â Pump
specifications used for drip irrigation systems shall be provided by the pump
manufacturer.
v)Â Â Â Â Â Â Â Â The
installation contractor, designer or homeowner, in consultation with the
manufacturer or the manufacturer's representative, shall assure that the pump
used is in compliance with this Part.
D)Â Â Â Â Â Â Â Time
Dosing
i)Â Â Â Â Â Â Â Â Â Drip
irrigation systems shall be provided with a timer to activate the dosing pump
equally throughout a 24-hour period.
ii)Â Â Â Â Â Â Â Â Systems
shall be dosed a minimum of 6 equal doses over a 24-hour period and shall be
capable of delivering the maximum daily design flow to the drip irrigation
system in a 24-hour period. More frequent doses of 8 to 24 equal doses over a
24-hour period are recommended and shall be required in soils that have a
loading rate of less than 0.5 gallons/square foot/day.
iii)Â Â Â Â Â Â Â The
dosing frequency shall be such that the soil surrounding the drip irrigation
system does not become saturated.
iv)Â Â Â Â Â Â Â The
dosing specifications shall be provided by the drip irrigation manufacturer or
the manufacturer's representative in accordance with this Part.
E)Â Â Â Â Â Â Â Effluent
Filtration
i)Â Â Â Â Â Â Â Â Â Wastewater
effluent shall be filtered to the drip tubing manufacturer's specifications to
ensure proper operation of the distribution system.
ii)Â Â Â Â Â Â Â Â The
effluent filtration device shall be easily accessible for maintenance and
inspection.
F)Â Â Â Â Â Â Â Â Drip
Distribution System
i)Â Â Â Â Â Â Â Â Â The
drip distribution tubing manufacturer or the manufacturer's representative
shall provide written specifications for all components used in conjunction
with the drip irrigation system.
ii)Â Â Â Â Â Â Â Â The
manufacturer or the manufacturer's representative shall assure that all
manufacturer specifications for the drip irrigation system are in compliance
with this Part.
iii)Â Â Â Â Â Â Â The manufacturer
shall incorporate measures to prevent root intrusion into the emitters.
G)Â Â Â Â Â Â Â Drip
Emitters and Flow Rates
i)Â Â Â Â Â Â Â Â Â The
manufacturer of the drip tubing shall specify the number of drip emitters per
lineal foot and the flow rates through each emitter for different pressures.
ii)Â Â Â Â Â Â Â Â The
installation contractor or homeowner, in consultation with the manufacturer or
the manufacturer's representative, shall assure that the number of emitters to
be used in a drip irrigation system and the types of emitters used, flows and
flow rates into the soil comply with all of the manufacturer's specifications
and requirements and with this Part.
H)Â Â Â Â Â Â Â Absorption
Field Sizing
i)Â Â Â Â Â Â Â Â Â A
soil investigation shall be conducted in accordance with Section 905.55(a).
ii)Â Â Â Â Â Â Â Â The
soil loading rate (gallons/square foot/day) shall be based upon the least
permeable soil condition encountered within 24 inches below the proposed depth
of the drip irrigation tubing.
iii)Â Â Â Â Â Â Â The
system size shall be based upon Appendix A, Illustration M, Exhibits A and B.
I)Â Â Â Â Â Â Â Â Drip
Tubing Installation and Configuration
i)Â Â Â Â Â Â Â Â Â The
drip tubing shall be installed in the natural soil using installation equipment
and procedures specified by the manufacturer.
ii)Â Â Â Â Â Â Â Â Drip
irrigation tubing shall be installed at a depth of 6 inches to 12 inches below
the final graded surface.
iii)Â Â Â Â Â Â Â Drip
irrigation tubing shall be installed on a minimum of 2-foot centers.
iv)Â Â Â Â Â Â Â When
the drip irrigation piping is installed on slopes exceeding 20%, the spacing
between the drip irrigation piping shall be 3 feet or greater.
v)Â Â Â Â Â Â Â Â The
drip irrigation system shall be configured so that the length of the area of
the drip irrigation tubing system is at least two times its width. If this is
not possible, the drip irrigation tubing trench separation distance shall be
doubled.
vi)Â Â Â Â Â Â Â The
length of individual drip distribution tubing shall not exceed the manufacturer's
specifications and shall be installed at a uniform depth that follows the
contour of the site.
vii)Â Â Â Â Â Â The
drip irrigation tubing shall be installed a minimum of 12 inches above a
limiting layer.
J)Â Â Â Â Â Â Â Â Considerations
to Prevent Freezing
i)Â Â Â Â Â Â Â Â Â The
distribution and return manifolds shall be installed to drain back to the
pre-treatment tank after the field has been dosed.
ii)Â Â Â Â Â Â Â Â If
the elevations of the pre-treatment tank and dosing tank do not allow gravity
flow to the pre-treatment tank, the lines shall be installed to drain back to
the dosing tank.
iii)Â Â Â Â Â Â Â All
piping and components shall be installed to allow water to drain back to the
pre-treatment tank or dosing tank.
iv)Â Â Â Â Â Â Â To
allow for drain back, a check valve shall not be installed in the supply and
return lines.
K)Â Â Â Â Â Â Â Fill
Soils
Fill soils may be used in accordance
with subsection (a), except that the soil surface shall not be plowed.
L)Â Â Â Â Â Â Â Pressure
Requirements
i)Â Â Â Â Â Â Â Â Â The
manufacturer of the drip tubing shall specify the operating pressure
requirements of the drip irrigation system and provide the specifications of
any pressure regulator that may be required with the drip irrigation system.
ii)Â Â Â Â Â Â Â Â A
pressure gauge shall be provided or a method of connecting a pressure gauge
shall be provided on the distal end of the drip irrigation system to ensure
that field pressure can be checked during inspection, evaluation and
maintenance. The installation contractor or manufacturer shall ensure that the
irrigation system is operating at the required specifications.
M)Â Â Â Â Â Â Flush
Valves
i)Â Â Â Â Â Â Â Â Â An
automatic or manual flush valve shall be provided on the filter and drip
distribution system to allow for periodic flushing of both the drip distribution
system and the filter.
ii)Â Â Â Â Â Â Â Â The
drip distribution system manufacturer shall provide the specifications for the
flush valves that are acceptable to use with the system. The manufacturer
shall also provide specifications on the number of flush valves to be used and
their location, with specifications about how this is to be determined and the
backwash velocity required to clean the drip tubing piping.
iii)Â Â Â Â Â Â Â A
chemical injection port shall be installed to facilitate cleaning and flushing
the drip distribution system.
iv)Â Â Â Â Â Â Â Backwash
water shall be directed into the building sewer at the inlet end of the
pre-treatment system.
N)Â Â Â Â Â Â Â Air
Relief
i)Â Â Â Â Â Â Â Â Â The
manufacturer of the drip tubing shall specify the air relief requirements of
the drip distribution system and provide the specifications of any air relief
devices that may be required with the drip irrigation system to ensure that the
distribution piping can drain back to the dosing chamber when the system is not
pressurized.
ii)Â Â Â Â Â Â Â Â The
air relief device shall be installed at the highest point of the feed and
return manifolds.
O)Â Â Â Â Â Â Â Alarm
i)Â Â Â Â Â Â Â Â Â An
audible and visual alarm shall be provided to warn of a high water condition in
the dosing tank.
ii)Â Â Â Â Â Â Â Â The alarm shall be on
a separate dedicated circuit.
iii)Â Â Â Â Â Â Â The
alarm control device shall be a sealed float or diaphragm switch and shall be
located to activate 2 to 3 inches above the pump turn-on level or siphon
activation level.
iv)Â Â Â Â Â Â Â The
alarm shall be located outside of the structure served by the system and shall
be provided with an electrical disconnect that is located within sight of and
not more than 50 feet away from the device.
v)Â Â Â Â Â Â Â Â If an
alarm is being used by another component within the private sewage disposal
system, is compliant with subsections (g)(1)(O)(i) through (iv), and is able to
connect additional devices, it may be used without the need for an additional
alarm.
P)Â Â Â Â Â Â Â Â Access
i)Â Â Â Â Â Â Â Â Â Access
openings to the pre-treatment system, effluent filtration system, and dosing
tanks shall have a minimum inside dimension of 18 inches, shall be watertight
and shall extend to 3 inches or more above the ground surface.
ii)Â Â Â Â Â Â Â Â Access
openings to all other system components shall be large enough to allow easy
access from the ground surface.
Q)Â Â Â Â Â Â Â Maintenance
i)Â Â Â Â Â Â Â Â Â The
manufacturer shall provide specifications for the maintenance of all components
within the drip irrigation system.
ii)Â Â Â Â Â Â Â Â The
manufacturer shall provide a maintenance plan to ensure that maintenance is
conducted as required to achieve the proper function of the system.
2)Â Â Â Â Â Â Â Â The
installation contractor or manufacturer shall provide the following information
to the owner of the system:
A)Â Â Â Â Â Â Â An operation manual;
B)Â Â Â Â Â Â Â The maintenance plan for
the drip irrigation system;
C)Â Â Â Â Â Â Â The
manufacturer of the components and a description of the function of the
components;
D)Â Â Â Â Â Â Â The service contract
information;
E)Â Â Â Â Â Â Â A troubleshooting repair
guide;
F)Â Â Â Â Â Â Â Â A list of safety
concerns;
G)Â Â Â Â Â Â Â Manufacturer's
cut sheets for all electrical and mechanical components; and
H)Â Â Â Â Â Â Â An as-built drawing of