77 Ill. Adm. Code 906.30
Soil and Site Requirements
Section 906
Section 906.30Â Soil and Site
Requirements
In order to be suitable for
mound construction, the site shall meet the following requirements and those
listed in Appendix A, Exhibit A.
a)        Percolation Rates. Percolation rates shall be used to
determine the suitability of the site for accepting effluent. Percolation
tests shall be performed according to the procedure outlined in Appendix A,
Illustration G of the Private Sewage Disposal Code (77 Ill. Adm. Code 905).Â
Excepting that, percolation tests shall be performed at a depth of 20-24 in.
from the natural surface. However, in cases where a more slowly permeable soil
horizon is above this depth the percolation tests shall be conducted in the
more slowly permeable soil horizon. Those results shall be used in the design
of the mound. For shallow permeable soils over pervious bedrock, the
percolation test shall be run at a depth of 12-18 in. below the natural
surface. For permeable soils with high water tables, the percolation test
shall be run at a depth of 20-24 in. below the natural surface.
b)        Depth to Pervious Rock or Seasonal High Water Table. There
shall be a minimum of 24 in. of unsaturated soil between the soil surface and
pervious bedrock or the seasonal high water table, including a perched water
table, at the proposed mound site. High water tables can be determined by
direct observation or by soil mottling. Occurrence of grey and red soil
mottling patterns can be used to indicate periodic saturation with water.
c)        Rocky Soils. If the soil contains 50% rock fragments or more
by volume in the upper 24 in. of soil, the mound basal area shall be 25% larger
than that normally required.
d)        Slopes. The mound shall be placed upslope and not at the base
of the slope of the existing ground. On a site where there is a complex slope,
(two directions), the mound shall be situated such that the liquid is not
concentrated in one area downslope. Upslope runoff shall be diverted around
the mound. For the more permeable soils where the percolation rate is 18-179
min., slopes shall not exceed 12%. For tighter soils where the percolation
rate is 180-360 min., slopes shall not exceed 6%.
e)        Flood Plains. Construction of mound systems shall not be
allowed in flood plains, drainage ways or depressions.
f)        Sites with Trees and Large Boulders. Sites with large trees,
numerous smaller trees or large boulders are unsuitable for the mound system.Â
If no other site is available, the trees shall be cut off at ground level,
leaving the stumps. An increase in mound basal area shall be required where stumps
are involved, so that sufficient soil is available to accept the effluent. The
increase in mound area shall equal the surface area of the stumps on the mound
site.
g)Â Â Â Â Â Â Â Â Site Preparation
1)Â Â Â Â Â Â Â Â Vegetation shall be cut and removed from the site prior to construction.Â
The site must then be plowed with a mold board plow 7-8 in. deep with the
plowing done perpendicular to the slope. Plowing shall not be done with the
furrow running up and down the slope. Chisel plowing may be used in place of
mold board. Roto tilling is prohibited. However, roto tilling may be used to
incorporate the vegetative cover in unstructured soil such as sand.
2)Â Â Â Â Â Â Â Â Site preparation shall not take place when the soil is too
wet. The soil shall be considered too wet when a soil sample taken at a depth
of 7-8 in. beneath the surface can be rolled between the palms of the hands
into a continuous ribbon of soil. If the soil crumbles, site preparation can
then proceed.
3)Â Â Â Â Â Â Â Â Once the site is plowed, all construction machinery and other
vehicles shall be kept off the mound site. The fill material shall be
deposited on the site with a backhoe or pushed on from the side, using a track
type tractor, keeping 6 in. of fill beneath the tracks. At no time shall ruts
be made in the plowed area. Â The fill shall be placed immediately after site
preparation to avoid the possibility of precipitation falling on the plowed
area.
4)Â Â Â Â Â Â Â Â All work shall be performed from the ends and upslope side,
especially on fine textured soils.