77 Ill. Adm. Code 906.40
Fill Material
Section 906
Section 906.40Â Fill Material
a)Â Â Â Â Â Â Â Â Below Absorption Area
1)Â Â Â Â Â Â Â Â A mound system shall be provided with a fill material beneath
the absorption area (trenches or bed). One of the following fill materials
shall be used.
A)Â Â Â Â Â Â Â FA-1
B)Â Â Â Â Â Â Â FA-2
C)Â Â Â Â Â Â Â FA-3
D)Â Â Â Â Â Â Â FA-8
E)Â Â Â Â Â Â Â FA-9
2)Â Â Â Â Â Â Â Â These materials are classified and graded in accordance with
Illinois Department of Transportation, Division of Highways specifications for
fine aggregate. These materials shall meet the gradation specifications as
shown for these five fine aggregates in Appendix A, Exhibit B.
b)        Above the Absorption Area. The cap (area above the bed or
trenches) shall consist of a topsoil to allow plant growth. Sands are not
allowed since they drain rapidly and allow more infiltration of precipitation
into the absorption area. Topsoil shall be placed to a depth of 6 in. over the
entire mound to promote good vegetation cover. The cap soil shall be seeded
and fertilized.