77 Ill. Adm. Code 906.60
Distribution System (for sewage flows of less than 800 gallons per day)
Section 906
Section 906.60Â Distribution
System (for sewage flows of less than 800 gallons per day)
a)        Piping System. The piping distribution system for the mound
shall consist of a manifold pipe and small diameter laterals with perforations.
The perforations shall be drilled at 30"-36" intervals along with the
invert of the lateral. Perforations shall be installed perpendicular to the
pipe axis. Perforation diameters shall be between 3/16" and ¼". If
the distance between the end of the lateral and the nearest perforation is
greater than ½ the perforation spacing used, another hole shall be installed in
or near the end cap of the lateral. A typical distribution system of a mound
is shown in Appendix A, Illustration E. For a trench system, one lateral shall
be required per trench; for a bed system, up to 3 laterals may be used.Â
Laterals shall extend to within 6 inches of the end of the bed or trench.Â
Lateral spacing shall be a maximum of 3 ft. for beds in small mounds only (1-4
bedroom sized system). Pipe diameter will depend upon the length of bed or
trenches. The allowable lateral lengths for various size diameter pipes and
various hole spacings are given in Appendix A, Exhibit D. The system shall be
designed and placed so that the laterals and manifold drain after every
dosing. If the mound is downslope of the pumping chamber, the manifold shall be
on top of the laterals so the manifold drains, or cross-to-cross construction
used. For systems which are to treat a flow of more than 800 gallons per day,
the manifold and lateral network must be designed in accordance with Section
906.70. All piping shall be Schedule 40 Polyvinyl Chloride (ASTM Standard
D1785/76) or Schedule 40 Acrylonitrile/Butadiene/Styrene (ASTM Standard
D1527/77).
b)        Pumping System. The components of the pumping system shall
consist of the pumping chamber, pump, pump controls and alarm system as shown
in Appendix A, Illustration F. The dosing volume shall be ten times the total
lateral pipe void volume or one-fourth the estimated daily sewage flow,
whichever is greater. Appendix A, Exhibit F lists the void volumes for various
sizes of pipe. The daily volume of sewage shall be determined using Appendix
A, Illustration A of the Private Sewage Disposal Code (77 Ill. Adm. Code 905).
1)Â Â Â Â Â Â Â Â Pumping Chamber Requirements.
A)       Pumping Chamber. Appendix A, Illustration F gives a cross-section
of a typical pumping chamber. The volume shall be sufficient to provide the
desired dosing volume, space for controls, space for setting the pump on a
pedestal, and extra volume for a malfunction and flow-back after pump shuts
off. Appendix A, Exhibit G establishes pumping chamber sizes for the various
sized systems. Larger tanks may be used, but they may limit the flexibility of
adjusting the desired dosing quantity. Sufficient volume must be available to
provide for the dose volume, pump pedestal and controls.
B)       The pumping chamber shall be waterproof. Waterproofing shall
consist of sealing all joints and coating the outside of the tanks. The
pumping chamber shall be filled with water after being installed and back
filled to prevent the pumping chambers from floating out of position due to
hydrostatic pressures, unless the tank is installed in dry soil. A riser pipe
shall extend at least 6 in. above the ground surface. All electrical controls
shall be mounted outside the tank. The pump disconnect shall be accessible for
easy pump removal in the event of pump failure.
2)        Pump Selection. The pump shall be a submersible pump designed
for corrosive liquids and shall be capable of maintaining at least 2 feet of
head at the distal ends of the laterals. The pump switch shall be controlled
by a float in the pumping chamber, set so that the required dosing volume is
discharged during each pumping cycle. A check valve between the pump and the
piping network manifold shall not be allowed.
3)        Pump and Alarm Control. The control system for the pumping
chamber shall consist of a control for operating the pump and an alarm system
to detect when the system is malfunctioning. Pump controls shall be selected
which give flexibility in adjusting the on-off depth. Example of acceptable
controls are shown in Appendix A, Illustration F. Pump controls shall be
adjusted to pump the required dose of sewage plus the volume of sewage which
flows back to the pumping chamber after shut-off.
4)        Electrical and Alarm System. The alarm system shall consist
of an audible and visual alarm in the home or facility building. This system
shall be on a circuit separate from the pump. The electrical controls shall be
placed outside the pumping chamber.
5)        Siphons. Siphons can be designed where elevation exists
between the mound and the siphon chamber. However, the siphon shall be
designed to deliver the same flow rate at the same head at the distribution
system as a pump system. The distribution system consisting of manifold and
laterals shall be designed so that it will drain after each siphon. This shall
be accomplished by placing the manifold above the laterals.