83 Ill. Adm. Code 466.140
Records
Section 466.140 Records
a) An
EDC shall maintain records specified in this subsection for a minimum of five
years, and shall make publicly available:
1) The
total number of and the nameplate and export capacity of the completed interconnection
requests received, studied, approved and installed, approved and withdrawn, and
denied under Level 1, Level 2, Level 3 and Level 4 reviews; and
2) The
fuel type, total number and the nameplate and export capacity of DER facilities
approved.
b) An
EDC shall provide a public report to the Commission containing the information
required in subsection (a) within 90 calendar days after the close of each
calendar year. An electronic version, in electronically searchable format in a
legible 12-point font size in PDF shall be delivered to the Commission's
offices on CDs or DVDs or filed electronically with the Chief Clerk.
c) Each
EDC shall retain copies of studies it performs to determine the feasibility of,
system impacts of, or facilities required by the interconnection of any DER
facility. The EDC shall provide the applicant copies of any interconnection studies
performed in analyzing the applicant's interconnection request upon applicant
request, including all information used by the EDC in completing the studies
and determining the estimated interconnection cost. Each EDC shall provide the
Commission, upon request, copies of any interconnection studies performed in
analyzing any interconnection request, including all information used by the EDC
in completing the studies and determining the estimated interconnection costs.
d) Each EDC shall maintain, and provide upon
request to the Commission and any interconnection customer or applicant (see Section
466.50), a written set of standards by which the EDC evaluates the scope of
upgrades for an interconnection and methodology for determining cost estimates
required by this Part. To the extent the documentation contains confidential or
proprietary information, the EDC shall clearly mark that information and may
request that interconnection customer or applicant execute a confidentiality
agreement prior to receiving or reviewing the documentation.
e) Each
EDC serving more than 500,000 customers shall make available on its website
hosting capacity analysis results, including mapping and GIS capability.