8 Ill. Adm. Code 900.504
Livestock Waste Handling Facilities Subject to the Public Informational Meeting Process
Section 900
Section 900.504 Livestock
Waste Handling Facilities Subject to the Public Informational Meeting Process
For a livestock waste
handling facility
, other than a livestock waste lagoon,
that is subject
to
the public informational meeting process as outlined in
Section 12 of
the Livestock Management Facilities Act [510 ILCS 77] and Subpart D of this
Part, the following procedures shall be followed:
a) The owner or operator shall file a completed
registration
with the Department
, on a form provided by the Department,
at least 37
calendar days prior to the anticipated dates of construction.
b)
The registration shall include the following:
1)
Name and address of the owner and operator of the livestock
waste handling facility;
2)
Location of the livestock waste handling facility;
3)
General description of the livestock waste handling
facility;
4)
Type and number of animal units of livestock served by the
livestock waste handling facility;
5) Specific location information noted on a facility site map or
livestock waste handling facility plot plan:
A) The location and distance to the nearest private or public
potable well;
B) The location and distance to the nearest stream;
C) The location and distance to the nearest abandoned or plugged
well, drainage well, or injection well located within 1,000 feet of the
proposed facility; and
D) The location of any subsurface drainage lines within 100 feet
of the livestock waste handling facility;
6)
Anticipated beginning and ending dates of construction
[510 ILCS 77/11(c)];
7) Results of a site investigation conducted in accordance with
Subpart C of 35 Ill. Adm. Code 506 to determine whether aquifer material is
considered present (or not present) within 5 feet of the planned bottom of the
livestock waste handling facility, the proposed facility is located in the
floodway or flood fringe of a 100-year floodplain, and the proposed facility is
located in a karst area or within 400 feet of a natural depression in a karst
area.
A livestock waste handling facility owner may rely on guidance from
the local soil and water conservation district, the Natural Resources
Conservation Service of the United States Department of Agriculture, or the
University of Illinois Cooperative Extension Service for soil type and
associated information.
[510 ILCS 77/13(c)];
8) A certification statement from the owner or operator on a form
provided by the Department. The statement, accompanied by supporting
justification and data from a Licensed Professional Engineer or Licensed
Service Professional Geologist or a representative of the Natural Resources
Conservation Service of the United States Department of Agriculture designated
to perform such functions, shall certify that the site investigation meets all
the applicable requirements of subsection (b)(7) of this Section and Subpart C
of 35 Ill. Adm. Code 506, and whether aquifer material is considered present
(or not present) within 5 feet of the planned bottom of the livestock waste
handling facility, the proposed facility is located in the floodway or flood
fringe of a 100-year floodplain, and the proposed facility is located in a
karst area or within 400 feet of a natural depression in a karst area; and
9)
Construction plan of the waste handling structure with
design specifications of the structure noted as prepared by or for the owner or
operator
in accordance with the requirements contained in Subpart C of 35
Ill. Adm. Code 506, including a livestock waste handling facility plot plan
with dimensions and elevations. [510 ILCS 77/11(c)]
c)
The Department shall, within 15 calendar days
after
receipt
of the registration form, notify the person submitting the form that the
registration is complete or that clarification information is needed.
[510
ILCS 77/11(c)] No later than 15 calendar days after receipt of the
clarification information, the Department shall notify the owner or operator
that registration is complete or that additional clarification is needed.
d)
When the county board requests an informational meeting,
construction shall not begin until after the informational meeting has been
held, the Department has reviewed the county board's recommendation and replied
to the recommendation indicating if the proposed new livestock management
facility or the new livestock waste handling facility is or will be in
compliance with the requirements of the Act, and the owner, operator, or
certified manager and operator has received the Department's notice that the
setbacks and all applicable requirements of
the
Act have been met.
[510 ILCS 77/12(c)]
If no informational meeting is held, the Department
shall, within 15 calendar days following the end of the period for the county
board to request an informational meeting, notify the owner or operator that
construction may begin or that clarification is needed.
[510 ILCS
77/12.1(b)]