92 Ill. Adm. Code 530.400
Underground Facilities – Power and Communication Lines
Section 530
Section 530.400 Underground
Facilities – Power and Communication Lines
a) General
1) Longitudinal lines shall be located as near the right-of-way
line as practicable and no more than eight feet from and parallel to the
right-of-way line.
2) Installation shall have a minimum cover of 30 inches except
communication lines installed by the plowed method shall have a minimum cover
of 24 inches.
3) Underground power cables must be grounded in accordance with
the National Electrical Safety Code (ANSI C2-1990).
b) Fully Access Controlled Highways
1) Longitudinal Lines
A) New underground power and communications lines longitudinal to
the centerline will not be permitted within the access-control lines of fully
access-controlled highways under the following conditions:
i) When the installation of the utility would require pavement
cuts.
ii) When non-emergency repairs of the utility would require the
use of any part of the highway.
iii) When the installation of the utility would endanger or impair
other utility facilities already in place.
iv) When the installation of the utility would be above-ground
after installation.
v) When the utility would interfere with or impair the present
use or future expansion of the highway.
B) When new underground power and communications lines are to be
permitted longitudinally to the centerline of fully access-controlled State
highways, the following conditions will apply:
i) No above-ground appurtenances will be allowed on State
highway right-of-way.
ii) No utility facilities will be allowed between the edge of
pavement and the back of abutment of the intersecting roadway at grade
separation structures.
iii) Bridge attachments may be allowed as specified in Subpart G.
2) Underground Crossings
Underground power and communication lines will be permitted
to cross fully access-controlled highways under the following conditions:
A) The crossing provides a transmission or distribution service to
a general area or an expanding area. No individual service crossings will be
permitted to cross a fully access-controlled highway except in cases involving
isolated locations such as landlocked areas.
B) The design, materials and construction methods shall be those
that can be expected to provide maximum maintenance-free service life.
C) Encasement shall be provided between jacking or bore pits, if
the crossing is installed by boring or jacking.
D) Encasement may be eliminated under the following conditions:
i) The crossing is installed by the use of "moles",
"whip augers" or other approved methods which compress the earth to
make the opening for cable installation.
ii) The installation is by the open trench method. This method
is only permitted prior to roadway construction.
E) Above-ground mounted appurtenances to electric power or
communication lines within the access-control lines of fully access-controlled
highways will normally not be permitted except in cases of extreme need. Where
installations are approved, they shall be located within one foot of the
right-of-way line or as near as practicable.
c) Conventional Highways
1) Longitudinal Lines
Underground power and communication lines may be permitted
longitudinal to the centerline of conventional State highways under the
following conditions:
A) Cable may be installed by trenching or plowing with
consideration given to boring to minimizing the damages when crossing improved
entrances and side roads.
B) Above-ground appurtenances constructed as component parts of
underground communication or electric power lines shall be located within one
foot of the right-of-way line or as near as practicable.
2) Underground Crossings
Underground power and communication lines will be permitted
to cross conventional highways under the following conditions:
A) The design materials and construction methods shall be those
that can be expected to provide maximum maintenance-free service life.
B) Encasement shall be provided between jacking or bore pits, if
the crossing is installed by boring or jacking.
C) Encasement may be eliminated under the following conditions:
i) The crossing is installed by the use of "moles,"
"whip augers" or other approved methods which compress the earth to
make the opening for cable installation.
ii) The installation is by the open trench method. This method
is only permitted prior to roadway construction.