Indiana · Regulations
Rule 7 — Award of Contracts
7 sections
7 sections
- 25 IAC 2-7-125 IAC 2-7-1 Bid acceptance or rejection; written contracts; director's recommendation
- 25 IAC 2-7-225 IAC 2-7-2 Lowest responsible bid acceptance criteria; rejection conditions
- 25 IAC 2-7-325 IAC 2-7-3 Conditional acceptance of bid; work load of bidder exceeding prequalification rating (Repealed)Repealed
- 25 IAC 2-7-425 IAC 2-7-4 Contract letter; documents required to initiate work
- 25 IAC 2-7-525 IAC 2-7-5 Restriction on meetings between state and contractor; notifying attorney general (Repealed)Repealed
- 25 IAC 2-7-625 IAC 2-7-6 Limitations on contract renewals
- 25 IAC 2-7-725 IAC 2-7-7 Contractor provided information