Indiana · Regulations
Rule 3 — Fee Schedules
16 sections
16 sections
- 675 IAC 12-3-1675 IAC 12-3-1 Availability (Repealed)Repealed
- 675 IAC 12-3-2675 IAC 12-3-2 Schedule of fees for site built construction
- 675 IAC 12-3-3675 IAC 12-3-3 Fireworks display permit fee
- 675 IAC 12-3-4675 IAC 12-3-4 Variance application fees
- 675 IAC 12-3-5675 IAC 12-3-5 Explosive magazine permit fee
- 675 IAC 12-3-6675 IAC 12-3-6 Construction inspection fees
- 675 IAC 12-3-7675 IAC 12-3-7 Statewide fire and building safety education fund
- 675 IAC 12-3-8675 IAC 12-3-8 Amusement and entertainment permit and inspection fees
- 675 IAC 12-3-9675 IAC 12-3-9 Fireworks wholesale permit fees
- 675 IAC 12-3-10675 IAC 12-3-10 Fireworks retail stand permit fees
- 675 IAC 12-3-11675 IAC 12-3-11 Inspection fee for existing buildings
- 675 IAC 12-3-12675 IAC 12-3-12 Returned check fee
- 675 IAC 12-3-13675 IAC 12-3-13 Boiler and pressure vessel inspection, permitting, and licensing fees
- 675 IAC 12-3-14675 IAC 12-3-14 Regulated lifting device permitting and certification fees
- 675 IAC 12-3-15675 IAC 12-3-15 Regulated lifting device professional licensing fees
- 675 IAC 12-3-16675 IAC 12-3-16 Civil penalties