675 IAC 15-2-69

675 IAC 15-2-69 Fixture tests

Last amended: 2023Year: 2027Length: 31 wordsOfficial source

Cite as Ind. Admin. Code tit. 675, r. 15-2-69

Sec. 69. The plumbing fixtures and connections shall be subjected to a slow test by filling them with water and checking for leaks and retarded flow while they are being emptied.
675 IAC 15-2-69: 675 IAC 15-2-69 Fixture tests | Justis AI