326 IAC 10-3-6
326 IAC 10-3-6 Violations
Cite as Ind. Admin. Code tit. 326, r. 10-3-6
Sec. 6. For purposes of determining the number of days of violations, if a Portland cement kiln or affected boiler has excess emissions for
an ozone control period, each day in the ozone control period constitutes a day in violation unless the owners and operators demonstrate that a lesser
number of days should be considered.