327 IAC 8-3.5-7
327 IAC 8-3.5-7 Certification
Cite as Ind. Admin. Code tit. 327, r. 8-3.5-7
Sec. 7. (a) The responsible person must sign and date the NOI, making the following certification, "I certify that I have reviewed and
understand the applicability and eligibility requirements of this rule and that the water main proposed with the submission of this NOI meets the
applicability and eligibility requirements of this rule. I also certify that the design and construction of this project will be performed under my
direction or supervision to assure conformance with 327 IAC 8-3.5, and will meet all local rules or laws, regulations, and ordinances.
The information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties
for submitting false information, including the possibility of fine and imprisonment.".
(b) A responsible person's professional engineer who is representing the design aspects of the proposed project must sign and date the NOI,
making the following certification, "I certify under penalty of law that the design of this project will be performed under my direction or supervision
to assure conformance with 327 IAC 8-3.5 and that the plans and specifications will require the construction of said project to be
performed in conformance with this rule. The design of the proposed project will meet all local rules or laws, regulations, and ordinances. The
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fine and imprisonment.".
(c) A responsible person's developer, resident project representative, or person who by other means is representing the construction aspects
of the proposed project must sign and date the NOI, making the following certification, "I certify under penalty of law that the construction of this
project will be performed under my direction or supervision to assure conformance with 327 IAC 8-3.5. The construction of the proposed
project will meet all local rules or laws, regulations, and ordinances. The information submitted is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and
imprisonment.".
(d) The responsible person representing the public water system for which the water main is proposed must sign and date the NOI, making
the following certification, "I certify under penalty of law that I agree to furnish water to the area in which the water main is proposed. I acknowledge
the public water system's responsibility for examining the plans and specifications to determine that the proposed water main meets local rules or
laws, and ordinances. I also acknowledge the public water system's responsibilities as outlined in 327 IAC 8-3.5-12. I am aware that
there are significant penalties for submitting false information, including the possibility of fine and imprisonment.".