Indiana · Regulations
Rule 3.5 — 5. General Construction Permit for Water Mains
12 sections
12 sections
- 327 IAC 8-3.5-1327 IAC 8-3.5-1 Definitions
- 327 IAC 8-3.5-2327 IAC 8-3.5-2 Incorporation by reference (Repealed)Repealed
- 327 IAC 8-3.5-3327 IAC 8-3.5-3 Eligibility and exclusions for eligibility
- 327 IAC 8-3.5-4327 IAC 8-3.5-4 Notice of intent letter
- 327 IAC 8-3.5-5327 IAC 8-3.5-5 General construction permit conditions
- 327 IAC 8-3.5-6327 IAC 8-3.5-6 Responsible person
- 327 IAC 8-3.5-7327 IAC 8-3.5-7 Certification
- 327 IAC 8-3.5-8327 IAC 8-3.5-8 General construction permit program ban
- 327 IAC 8-3.5-9327 IAC 8-3.5-9 Effect of general permit rule
- 327 IAC 8-3.5-10327 IAC 8-3.5-10 Modification, nontransferability, retraction, and expiration
- 327 IAC 8-3.5-11327 IAC 8-3.5-11 Inspection and enforcement
- 327 IAC 8-3.5-12327 IAC 8-3.5-12 Requirements for the public water system