329 IAC 11-12-2 Preoperational requirements
Cite as Ind. Admin. Code tit. 329, r. 11-12-2
Sec. 2. Before beginning operation, a solid waste processing facility must complete the initial facility development outlined in the permitted
plans and specifications. Initial facility development includes the following:
(1) Construction of buildings or structures and on-site roads.
(2) Installation of equipment for storage, processing, and handling of solid waste.
(3) Installation of the following:
(A) Access control.
(B) Sanitary facilities.
(C) Signs.
(D) Communication devices.
(E) Utilities.
(4) Financial assurance must be established under 329 IAC 11-16 for the solid waste processing
facility.