329 IAC 11-12-2

329 IAC 11-12-2 Preoperational requirements

Last amended: 2026Year: 2027Length: 84 wordsOfficial source

Cite as Ind. Admin. Code tit. 329, r. 11-12-2

Sec. 2. Before beginning operation, a solid waste processing facility must complete the initial facility development outlined in the permitted plans and specifications. Initial facility development includes the following: (1) Construction of buildings or structures and on-site roads. (2) Installation of equipment for storage, processing, and handling of solid waste. (3) Installation of the following: (A) Access control. (B) Sanitary facilities. (C) Signs. (D) Communication devices. (E) Utilities. (4) Financial assurance must be established under 329 IAC 11-16 for the solid waste processing facility.
329 IAC 11-12-2: 329 IAC 11-12-2 Preoperational requirements | Justis AI